Suggestions for takt production subcontract clauses – a conceptual study
Purpose This study aims to provide a foundation for the development of subcontracts that suit takt production in construction. Design/methodology/approach This is a non-empiric conceptual study, which integrates takt production and general construction literature into new proposals for subcontract clauses suitable for takt production in construction.
Saari Arto +2 more
openaire +3 more sources
Simulation Optimization of Manufacturing Takt Time for a Leagile Supply Chain with a De-coupling Point [PDF]
Achieving agility with leanness in supply chains is considered to be a challenge for industry and academia. In order to cope with dynamic demands at extreme downstream, buffer stocks at various points on the supply chain can be seen as a solution ...
Laxmi Narayan Pattanaik
doaj +1 more source
From Molecule to Meaning: Click and Bioorthogonal Chemical Reporters for Plant Systems, Biological Imaging, and Artistic Expression. [PDF]
At the intersection of chemical biology, plant imaging, and contemporary art, this review introduces the concept of chembioart. By tracing how chemical reporters illuminate plant biomolecules in vivo, their role not only in advancing scientific understanding but also in inspiring transdisciplinary collaborations and visual expression is highlighted ...
Hinnebo M +4 more
europepmc +2 more sources
Nowadays, in the domain of production logistics, one of the most complex planning processes is the accurate forecasting of production and assembly efficiency.
Péter Dobra, János Jósvai
doaj +1 more source
Mixed-Model Assembly Line Balancing in The Process of Assembling Trimming Area to Minimize Workstation Using RPW-MVM Method [PDF]
The development of an industry that continues to move forward coupled with global competition and openness demands that the company continues to evolve and always make improvements in improving the performance of its production process.
Ali Yusuf Muhamad +2 more
doaj +1 more source
Impact of Takt-Time Planning on Plastering Work Productivity: A Case Study
Abstract This article aims to analyze productivity issues during the implementation of plastering works on the case study of a residential complex. The results of the study revealed that establishing a proper work schedule and adhering to the Takt schedule resulted in a 19% increase in plastering productivity compared to non-Takt ...
Kozlovská Mária, Kempecova Daria
openaire +2 more sources
Analisis Perhitungan Stroke Per Hour (SPH) produk cross Tube pada PT. Masbi Sukses
In the development of the times, the industry in Indonesia began to experience rapid development. PT. Masbi Sukses is one of the industrial companies that produces a component in the form of components from four-wheeled and two-wheeled vehicles.
Naufal Rafi Muslim, Oleh Oleh
doaj +1 more source
Continuous Improvement of Takt Production With Data-Driven Knowledge Management Approach
Peer ...
Lehtovaara, Joonas +4 more
openaire +3 more sources
Productivity improvement for heating ventilation and air conditioning unit assembly [PDF]
The objective of this research was to improve the productivity for the air conditioner unit of for car manufacturers. The target production volume of the air conditioner unit was greater than 46 pieces per hour. The current capacity was insufficient, so
Vichai Rungreunganun, Teansin Sriwasut
doaj +1 more source
A cyclic scheduling approach to maintaining production flow robustness
The organization of flow production, which is typical found in assembly processes, involves a repetitive, fixed-takt time flow of same-size production batches.
Grzegorz Bocewicz +3 more
doaj +1 more source