Results 71 to 80 of about 634 (165)
Applying Level of Detail in a BIM-Based Project: An Overall Process for Lean Design Management
Few construction companies apply the available lean tools and processes in an integrated manner when managing design. Additionally, lean design management tools and processes each have their own strengths and optimal phases in which they should be ...
Petteri Uusitalo +4 more
doaj +1 more source
Structure-Prior-Guided Point Cloud Completion for Industrial Mechanical Components
Point cloud completion for industrial mechanical components remains challenging due to reflections, self-occlusions, sparse sampling, and strict takt-time constraints in production, which often lead to large missing regions and incomplete fine structures.
Chendong Yao +4 more
doaj +1 more source
The Markov Chains Model was proposed to analyze stochastic events when recursive cycles occur; for example, when rework in a continuous flow production affects the overall performance.
Eldon Glen Caldwell Marin
doaj
Purpose: The paper is primarily done on the purpose of introducing new concept in defining the Overall Equipment Effectiveness (OEE) with the consideration of both machine utilization and customer demand requested.
Tay C.C. +2 more
doaj +1 more source
Karakuri Kaizen Design to Reduce Work Time at the Packing Station
This study investigates production bottlenecks at the packing station of PT Anta Boga Pangan Nusantara, where manual operations resulted in prolonged cycle times and reduced efficiency.
Yusuf Mauluddin, Bagas Fardiansyah
doaj +1 more source
Analyzing the Effects of Cell Related Factors and Takt Time on the Performance of Lean Interim Cells [PDF]
Cells formed in the early steps of lean transformation called interim cells and their performance is so important because these are the first actions to make the production operations lean.
Ashkan Ayough
doaj
Performance Comparison of Coreless PCB AFPM Topologies for Duct Fan
Duct fan motors must provide high torque within limited space to maintain airflow while requiring low vibration characteristics to minimize fluid resistance caused by fan oscillation.
Seung-Hoon Ko +4 more
doaj +1 more source
Enhancing the Productivity and Assembly Line Balancing Through Takt Time Implementation
Abstract In Pakistan, automotive sector is setting leaps in term of expansion, and achieved a phenomenal growth of 171% between the years 2014 and 2018. Keeping in view, the high demand and production of the sector, it is crucial to generate fruitful revenue from it.
Muhammad Khalil +3 more
openaire +1 more source
Increasing Takt of Production at SKANSKA Byggsystem
This project was carried out because of a need for increasing the production efficiency atSKANSKA Byggsystem. The current production takt is 20 modules per week which at first stepshould become 24 modules per week and in a second stage, 28 modules per week.In this regard, the lean approach is applied to modify the procedures the productionprocesses are
openaire +1 more source
Conventional single-modality or loosely coupled inspection systems often degrade under partial occlusion, transient sensor dropout, or illumination drift, and their feedback to Manufacturing Execution Systems (MES) can be delayed or non-deterministic. We
Yong Lin, Wendi Lin, Yadi Lin
doaj +1 more source

