Results 221 to 230 of about 955,170 (266)
Some of the next articles are maybe not open access.
Validation of diagnostic tests
Intensive Care Medicine, 1993B. Bermejo +4 more
openaire +2 more sources
1996
Testing is a complex engineering effort and must be well planned in order to be executed properly. In order to test a product the supplier must be able to identify the various levels of testing to be performed and the requirements for those levels of testing.
Raymond Kehoe, Alka Jarvis
openaire +1 more source
Testing is a complex engineering effort and must be well planned in order to be executed properly. In order to test a product the supplier must be able to identify the various levels of testing to be performed and the requirements for those levels of testing.
Raymond Kehoe, Alka Jarvis
openaire +1 more source
2014
Two critical steps in the model building process are model specification and model estimation. In this chapter we turn to the next stage in model building: validation (also verification or evaluation) .
Peter S. H. Leeflang +3 more
openaire +1 more source
Two critical steps in the model building process are model specification and model estimation. In this chapter we turn to the next stage in model building: validation (also verification or evaluation) .
Peter S. H. Leeflang +3 more
openaire +1 more source
An Updated Guideline for Assessing Discriminant Validity
Organizational Research Methods, 2022Mikko Ronkko, Eunseong Cho
exaly
1982
Testing and validation are more closely associated with quality assurance and control than configuration management. Nevertheless, the two control systems are connected, as described in chapter 1. CM is responsible for ensuring that the measuring points required by quality assurance (QA) exist, and this subject has already been covered in chapter 3. In
openaire +1 more source
Testing and validation are more closely associated with quality assurance and control than configuration management. Nevertheless, the two control systems are connected, as described in chapter 1. CM is responsible for ensuring that the measuring points required by quality assurance (QA) exist, and this subject has already been covered in chapter 3. In
openaire +1 more source
Proceedings of the second international conference on Industrial and engineering applications of artificial intelligence and expert systems - IEA/AIE '89, 1989
J. A. Long, Ian M. Neale
openaire +1 more source
J. A. Long, Ian M. Neale
openaire +1 more source
A new criterion for assessing discriminant validity in variance-based structural equation modeling
Journal of the Academy of Marketing Science, 2014Jörg Henseler +2 more
exaly

