Results 41 to 50 of about 149,695 (117)

A study of influence of geometric parameters on response of timber footbridges [PDF]

open access: yes, 2017
V magistrskem delu opravimo parametrično študijo vpliva spreminjanja geometrije lesenih brvi na učinke vplivov. Izberemo si tri značilne oblike brvi ter obliko z geometrijo po lastni zasnovi.
Gantar, Uroš
core  

Emergence of the London Millennium Bridge instability without synchronisation. [PDF]

open access: yesNat Commun, 2021
Belykh I   +6 more
europepmc   +1 more source

Monitoring of a Timber Footbridge

open access: yes, 2015
Alvsbacka Bridge was erected in the summer of 2011. During the planningof the construction researchers from LTU and SP Tr¨a designed ahealth monitoring system that constantly measures different parameterson the bridge. The motivation for health monitoring systems is several:Bridge safety, verification of the design and complement during inspections ...
openaire   +1 more source

Cortical concepts: Advanced membranes for the timber age : Innovative façades for multi-storey timber buildings

open access: yes, 2014
To an extent, the architecture of each era is dictated by the material context prevalent at the time. Architecture's Steel Age gave way to its Concrete Age, which is now giving way to the newfangled Timber Age. As has historically been the case, however,
Girhammar, Ulf Arne   +2 more
core   +2 more sources

The Timber-Precast UHPC Composite Connection

open access: yes, 2018
This paper deals with the connection of timber beams and precast concrete slabs. The connection of timber and concrete has many advantages associated with the efficient use of both materials, not only in terms of their stress.
Holý M., Vráblík L.
core   +2 more sources

Home - About - Disclaimer - Privacy