Results 81 to 90 of about 175 (127)

Fort Hill, stone for footbridge phototgraph

open access: yes, 1934
Workmen place stone for footbridge abutments. Design and estimate of costs for two timber footbridges near the shelter building were approved for construction on September 14, 1934. Work on the project started a few days later.
Civilian Conservation Corps (U.S.)
core  

Fort Hill, footbridge almost complete photograph

open access: yes, 1934
A photo of workmen on the footbridge almost completed. Design and estimate of costs for two timber footbridges near the shelter building were approved for construction on September 14, 1934. Work on the project started a few days later.
Civilian Conservation Corps (U.S.)
core  

Collection and Analysis of Dynamic Data for Long-Term Performance Assessment of Timber Pedestrian Bridges [PDF]

open access: yes
Pedestrian bridges play an important role in ensuring safe and efficient passage for pedestrians and cyclists in both urban and rural environments.
Essai, Arazoo Wadi Ahmed
core  

Dynamic behaviour of timber footbridges [PDF]

open access: yes, 2004
In ENV1995-2:1997 (Eurocode 5-Part 2), a simplified method is proposed for checking the serviceability limit state (SLS) of vibration in timber bridges subjected to the action of streams of pedestrians. The procedure estimates the values of peak acceleration in the deck under such conditions.
Negrão, João   +2 more
openaire   +2 more sources

Dynamic identification of a timber footbridge subject to vibration tests

open access: yes, 2008
Over the last thirty years timber bridges and footbridges have been found considerable use especially by their versatility, good durability and pleasing aesthetic view. First the development of new technology and materials, as the laminated timber, second the use of innovative building, assembling and connection techniques and third the expansion of ...
DIOTALLEVI, PIER PAOLO   +2 more
openaire   +2 more sources

On site dynamic test of a long span timber footbridge

open access: yes, 2002
In this paper in situ dynamic test results on a long span timber footbridge are reported. As a result of evident flexibility of the structure not taken into account for during the design phase, the test engineer required a dynamic test just after footbridge concluding, with the aim to get realistic values of the main dynamic performances so as to ...
DIOTALLEVI P. P.   +2 more
openaire   +2 more sources

Two Timber Footbridges, Sweden

Structural Engineering International: Journal of the International Association for Bridge and Structural Engineering (IABSE), 1993
exaly   +2 more sources

Home - About - Disclaimer - Privacy