Results 41 to 50 of about 312,610 (297)

A kernel-oriented algorithm for transmission expansion planning [PDF]

open access: yes, 2000
With deregulation sweeping all over electrical systems around the world, transmission planning has undergone dramatic changes during this decade.
Contreras, J, Wu, FF
core   +4 more sources

Transferrin receptor 1‐mediated iron uptake supports thermogenic activation in human cervical‐derived adipocytes

open access: yesFEBS Letters, EarlyView.
In this study, we found that human cervical‐derived adipocytes maintain intracellular iron level by regulating the expression of iron transport‐related proteins during adrenergic stimulation. Melanotransferrin is predicted to interact with transferrin receptor 1 based on in silico analysis.
Rahaf Alrifai   +9 more
wiley   +1 more source

Transmission expansion planning with optimal transmission switching considering uncertain n-k contingency and renewables

open access: yesEnergy Reports, 2022
This paper presents a novel model for transmission expansion planning (TEP) with optimal transmission switching (OTS) considering uncertain N-k contingency, renewables and loads.
Yang Yuan   +4 more
doaj   +1 more source

Market-Based Transmission Expansion Planning

open access: yesEnergy and Power Engineering, 2012
The paper presents the main features of transmission expansion problem (TEP). In accord with review the aims and influencing factors are defined. The competitive behaviors of market participants, transmission losses, discrete investment costs, various operating conditions are considered in the model.
Pavel Sergeyevich Drachev   +1 more
openaire   +2 more sources

Climate policy costs of spatially unbalanced growth in electricity demand: the case of datacentres. ESRI Working Paper No. 657 March 2020 [PDF]

open access: yes, 2020
We investigate the power system implications of the anticipated expansion in electricity demand by datacentres. We perform a joint optimisation of Generation and Transmission Expansion Planning considering uncertainty in future datacentre growth under ...
Fitiwi, Desta, Lynch, Muireann A.
core  

Does risk aversion affect transmission and generation planning? A Western North America case study [PDF]

open access: yes, 2016
We investigate the effects of risk aversion on optimal transmission and generation expansion planning in a competitive and complete market. To do so, we formulate a stochastic model that minimizes a weighted average of expected transmission and ...
Hobbs, B. F.   +3 more
core   +3 more sources

Plecstatin inhibits hepatocellular carcinoma tumorigenesis and invasion through cytolinker plectin

open access: yesMolecular Oncology, EarlyView.
The ruthenium‐based metallodrug plecstatin exerts its anticancer effect in hepatocellular carcinoma (HCC) primarily through selective targeting of plectin. By disrupting plectin‐mediated cytoskeletal organization, plecstatin inhibits anchorage‐dependent growth, cell polarization, and tumor cell dissemination.
Zuzana Outla   +10 more
wiley   +1 more source

Reproducible Method for Modifying a Published Electricity Network Model for Transmission Expansion Planning

open access: yesEnergies
Transmission network-expansion planning research requires reproducibility of results and comparability of research from various sources. This paper presents a process for modifying a published electricity network model so that the model can be used for ...
Peter Haigh   +2 more
doaj   +1 more source

Security Constrained Multi-Stage Transmission Expansion Planning Considering a Continuously Variable Series Reactor

open access: yes, 2017
This paper introduces a Continuously Variable Series Reactor (CVSR) to the transmission expansion planning (TEP) problem. The CVSR is a FACTS-like device which has the capability of controlling the overall impedance of the transmission line. However, the
Dimitrovski, Aleksandar   +2 more
core   +1 more source

Stepwise investment plan optimization for large scale and multi-zonal transmission system expansion [PDF]

open access: yes, 2016
This paper develops a long term transmission expansion optimization methodology taking the probabilistic nature of generation and demand, spatial aspects of transmission investments and different technologies into account.
Belmans, R   +3 more
core   +1 more source

Home - About - Disclaimer - Privacy