Results 91 to 100 of about 186 (124)
Some of the next articles are maybe not open access.
Implications of failure of alloy 718 (UNS N07718) tubing hanger in sour well
Engineering Failure Analysis, 2021Abstract High pressure/high-temperature (HP/HT) Oil & Gas wells in sour service are currently installed with UNS N07718 tubing hangers. Failure of UNS N07718 tubing hanger was recently discovered in one of the sour wells after more than ten years in service.
Janardhan Saithala, Amjad Kharusi
exaly +2 more sources
Development Of A Nonsealing Mudline Tubing Hanger For The Medusa Truss Spar
Offshore Technology Conference, 2005Abstract Use of a mudline tubing hanger (MLTH) is common in dry-tree deepwater applications with tight tolerances for tension management. It is run integral to the tubing string and can provide a pressure barrier as well as reduce the load to the platform. In single riser applications, a sealing MLTH is necessary to
k. Soter +4 more
exaly +2 more sources
Strength design method for tubing hanger of subsea christmas tree against big temperature difference
China Ocean Engineering, 2014The tubing hanger is an important component of the subsea Christmas tree, experiencing big temperature difference which will lead to very high thermal stresses. On the basis of API 17D/ISO 13628-4 and ASME VIII-1, and by comprehensively considering the erosion of oil and the gravity load of the tubing, a calculation model is established by regarding ...
Xiao-lan Luo +5 more
exaly +2 more sources
Offshore Technology Conference
Abstract This paper outlines a novel technology for aligning the tubing hanger (TH) within the wellhead, using the tubing hanger orientation spool (THOS) in subsea installations. This paper also details the results and lessons learned during actual project deployment of THOS system across various subsea projects. The
G. Jose +6 more
exaly +2 more sources
Abstract This paper outlines a novel technology for aligning the tubing hanger (TH) within the wellhead, using the tubing hanger orientation spool (THOS) in subsea installations. This paper also details the results and lessons learned during actual project deployment of THOS system across various subsea projects. The
G. Jose +6 more
exaly +2 more sources
Mudline Tubing Hanger Experience in Auger-Gulf of Mexico Wells
Proceedings of SPE Annual Technical Conference and Exhibition, 2002Abstract This paper describes development and application of a new design mudline tubing hanger (MLTH) for suspending tubing weight below the mudline in offshore wells. The new design has been deployed in fifteen Auger wells with 100% success.
Joe Stuckey +3 more
exaly +2 more sources
High-Power ESP Tubing-Hanger Connector for Deepwater Downhole Applications
JPT, Journal of Petroleum Technology, 2014This article, written by Special Publications Editor Adam Wilson, contains highlights of paper OTC 24138, ’Reliable High-Power ESP Tubing-Hanger Connector Systems for Deepwater Downhole Applications,’ by Sami Spahi, Teledyne Oil and Gas, and Pamela Parsley, Chevron Energy Technology Company, prepared for the 2013 Offshore Technology Conference, Houston,
exaly +2 more sources
Wireless Tubing Hanger Deployment in Deepwater Environment, the Bonga Field Experience
Offshore Technology ConferenceAbstract The deployment of Tubing Hangers (TH) in offshore subsea wells is a critical aspect of oil and gas production systems. The Tubing Hanger is a key component in well completion, allowing for the suspension of tubing, communication of hydraulic and electric functions downhole, and sealing the annulus. The installation and retrieval
J. Ngerebara, O. Alawode, I. Hamzat
exaly +2 more sources
IADC/SPE Asia Pacific Drilling Technology Conference, 2014
Abstract Traditionally, to complete a subsea well with a vertical Christmas tree, it is necessary to land the tubing hanger and install and pressure test a wireline set tubing hanger plug. Once the plug is tested, the subsea BOP can be removed, the vertical Christmas tree can be installed, and the plug retrieved through the work-over ...
Sigmund Sevatdal +2 more
exaly +2 more sources
Abstract Traditionally, to complete a subsea well with a vertical Christmas tree, it is necessary to land the tubing hanger and install and pressure test a wireline set tubing hanger plug. Once the plug is tested, the subsea BOP can be removed, the vertical Christmas tree can be installed, and the plug retrieved through the work-over ...
Sigmund Sevatdal +2 more
exaly +2 more sources
Reliable High Power ESP Tubing Hanger Connector Systems for Deepwater Downhole Applications
Offshore Technology Conference, 2013Abstract Electrical Submersible Pumps (ESPs) play a major role when it comes to artificial lift in deepwater reservoirs. Reliability of subsea equipment is an indispensable requirement in deepwater applications due to the high cost of interventions.
Sami Spahi, Pamela Parsley
exaly +2 more sources
SPE/ICoTA Symposium and Exhibition - Well Intervention
Abstract Objectives/Scope The innovative barrier-rated tubing hanger plug has been widely adopted by the Operator in P&A wells following a successful pilot installation in September 2022.
A. Abu Bakar +5 more
exaly +2 more sources
Abstract Objectives/Scope The innovative barrier-rated tubing hanger plug has been widely adopted by the Operator in P&A wells following a successful pilot installation in September 2022.
A. Abu Bakar +5 more
exaly +2 more sources

