Results 11 to 20 of about 11,192,129 (306)
Planning Manufacturing in a Concurrent Engineering Environment: A Case Study [PDF]
This paper presents an investigation of current state practice of the Manufacturing Engineering discipline for concurrent manufacturing planning. The research adopted a case study approach and has been conducted at a globally operating manufacturer of
Chris Beadle +5 more
core +1 more source
Modelling production ramp-up of engineering products [PDF]
Companies that introduce new products quickly have been shown to be better performers. The effectiveness of the new product introduction process is critical to their performance. Production ramp-up is a necessary phase of new product introduction, and
Roberts, S. +11 more
core +1 more source
Value stream analysis of manufacturing engineering new product introduction processes [PDF]
This paper describes the use of a methodology for value stream mapping and analysis of Manufacturing Engineering New Product Introduction processes. The applicability and usefulness of the technique to process improvement in this domain is explored in
Chris Beadle +5 more
core +1 more source
Mapping customer needs to engineering characteristics: an aerospace perspective for conceptual design [PDF]
Designing complex engineering systems, such as an aircraft or an aero-engine, is immensely challenging. Formal Systems Engineering (SE) practices are widely used in the aerospace industry throughout the overall design process to minimise the overall ...
Eres, M.H. +8 more
core +1 more source
Systematic Review of Value Engineering Research Studies In Indonesia
Value engineering (VE) plays a significant role in improving project competitiveness and propose an alternative solution to create added value for a project.
Perdana Miraj +4 more
doaj +1 more source
Indexing Model Based on Vector Normalization Available for Value Engineering in Building Materials
Value engineering is a method of selecting the optimum design by evaluating the value of the original design and the alternative design. However, if the function score and the cost score of the evaluation subject are indexed, the range of the function ...
Jongsik Lee
doaj +1 more source
The Soekarno-Hatta International Airport Rail Link (SHIARL) project is arguably one of the best solutions to reduce uncertainty in travel time and to improve accessibility to and from Soekarno-Hatta International Airport.
Herawati Z. Rahman +4 more
doaj +1 more source
Nowadays, liquefied natural gas (LNG) carriers are the main merchant fleets for the transport of natural gas for energy. The large LNG carrier has a more efficient freight cost (approximately 7.8 USD/MMBTU) than a small-scale LNG carrier (SSLNGC ...
Lathif Prasetyo Wibisana +1 more
doaj +1 more source
The Role of Value Engineering Job Plan in Prioritizing Finishing Flooring Selection Criteria [PDF]
Recently, finishing flooring requirements have been paid attention to construction projects. In learning spaces, especially drawing halls, finishing floor selection is one of the major challenges.
Shaimaa Zaki, Azza Hagag
doaj +1 more source
The integration of product design and supply-chain management can lead to an increase in the profitability and efficiency of companies. However, considering manufacturing, supply chain, and aircraft criteria in the early design phase increases the size ...
Giuseppa Donelli +2 more
doaj +1 more source

