Results 201 to 210 of about 39,483 (220)
Some of the next articles are maybe not open access.
CoatingsPro, 2006
Rehabilitating a wastewater facility’s concrete and steel infrastructure requires four months of hard work, 1,000 gallons of coatings - and hepatitis shots for the crew.
openaire +1 more source
Rehabilitating a wastewater facility’s concrete and steel infrastructure requires four months of hard work, 1,000 gallons of coatings - and hepatitis shots for the crew.
openaire +1 more source
The design for wastewater treatment plant (WWTP) with GPS X modelling
Cogent Engineering, 2020Hamidi Abdul Aziz
exaly
Effect of aeration mode on aerosol characteristics from the same wastewater treatment plant
Water Research, 2020Yunping Han, Tang Yang, Xu Yan
exaly
Nano/submicrometer-emulsion oily wastewater treatment inspired by plant transpiration
Matter, 2021Zubin Wang, Pu Guo, Liping Heng
exaly

