Results 221 to 230 of about 9,101,240 (246)
Some of the next articles are maybe not open access.
CoatingsPro, 2006
Rehabilitating a wastewater facility’s concrete and steel infrastructure requires four months of hard work, 1,000 gallons of coatings - and hepatitis shots for the crew.
openaire +1 more source
Rehabilitating a wastewater facility’s concrete and steel infrastructure requires four months of hard work, 1,000 gallons of coatings - and hepatitis shots for the crew.
openaire +1 more source
The design for wastewater treatment plant (WWTP) with GPS X modelling
Cogent Engineering, 2020Hamidi Abdul Aziz
exaly
Effect of aeration mode on aerosol characteristics from the same wastewater treatment plant
Water Research, 2020Tang Yang, Xu Yan, Lin Li
exaly

