Results 111 to 120 of about 56,979 (211)

U.S. Waterways Experiment Station Reports

open access: yes, 1988
This report represents a continuation of efforts by the Lower Mississippi Valley Division (LMVD), US Army Corps of Engineers, to develop an effective plan for and means of protecting the integrity of main line Mississippi River levees from the threat of ...
Torrey, Victor H., III
core  

Hydraulic prototype tests, control shaft 4, Fort Peck Dam, Missouri River, Montana

open access: yes, 2012
CORPS OF ENGINEERS, U. S. ARMY HYDRAULIC PROTOTYPE TESTS CONTROL SHAFT 4 FORT PECK DAM MISSOURI RIVER, MONTANA 01 101 101 0 00 810 TECHNICAL MEMORANDUM NO.
Waterways Experiment Station (U.S.)
core  

An improved global river vector dataset based on multi-source river data fusion. [PDF]

open access: yesSci Data
Liu Y   +9 more
europepmc   +1 more source

Home - About - Disclaimer - Privacy