Results 101 to 110 of about 1,883,484 (166)
Self-perceived loneliness on cognitive functioning and on self-perceived cognitive abilities in aging. [PDF]
Montemurro S +4 more
europepmc +1 more source
Effect of Diet Neutral Detergent Fibre Content on Dry Matter Intake, Nutrient Digestibility, Growth Efficiency and Carcass Characteristics of Finishing South African Mutton Merino Wether Lambs. [PDF]
De Klerk I +4 more
europepmc +1 more source
Harnessing nucleotide metabolism to control glycosylase base editing outcomes. [PDF]
Tao R +8 more
europepmc +1 more source
Microfluidics for cell therapy and manufacturing in oncology and regenerative medicine.
Duncan JL, Arroyo JP, Davalos RV.
europepmc +1 more source
Some of the next articles are maybe not open access.
Related searches:
Related searches:
Building Partnerships, 2000
There are three aspects to well efficiency. First is designing the most efficient well, second is selecting the most efficient pump, and third is operating system at the most efficient discharge. Without having a reliable simulation model, there is no way to determine optimal well design.
Otto J. Helweg, Melanie Bengtson
openaire +1 more source
There are three aspects to well efficiency. First is designing the most efficient well, second is selecting the most efficient pump, and third is operating system at the most efficient discharge. Without having a reliable simulation model, there is no way to determine optimal well design.
Otto J. Helweg, Melanie Bengtson
openaire +1 more source
Efficient Deepwater Well Testing
SPE Middle East Intelligent Oil and Gas Conference and Exhibition, 2015Abstract Well testing operations are an essential component in reservoir characterization process. In deepwater environments where rig costs are high, operating safely and cost efficiently is important. As a result, many operators are constantly searching for more efficient and cost effective ways to test their reservoirs.
Carl Walden +4 more
openaire +1 more source
Enhancing Well Construction for More Efficient Well Abandonment
SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, 2017Abstract The lack of planning for well plug and abandonment (P&A) during the well-construction phase can significantly contribute to the extended operational time and associated high cost of P&A. The impact on time and cost is mainly due to insufficient well data, uncertain casing cement integrity, and lack of information on ...
L. Dahmani, L. Hynes
openaire +1 more source

