Results 11 to 20 of about 915 (148)
钢板仓组合剪力墙是一种新型抗侧力构件,是以两块钢板和圆管支撑组成基本单元,空腔内填充混凝土的组合剪力墙。基于ABAQUS软件,建立了考虑材料非线性和几何非线性等因素影响的钢板仓组合剪力墙有限元分析模型,分析了钢板仓组合剪力墙圆管支撑布置密度、轴压比、含钢率及高宽比对其水平承载力和延性性能的影响。分析结果表明,钢板仓组合剪力墙具有较高的水平承载力和良好的变形能力,圆管支撑的布置密度对其延性性能和变形能力影响较大。支撑布置方式选用无支撑、1列(1×5)、2列(2×5)、3列(3×5)四种方式 ...
郁有升, 王轩
doaj
Analysis of the composite mechanical properties of the substructure of a masonry pagoda [PDF]
Brick wall tubes, a popular form of ancient masonry pagoda, can be seen as a spatial lateral force resistance system. The masonry of the ancient pagoda is a case of compression and shear developed due to earthquakes.
Jin-xin FAN +3 more
core +1 more source
首先对带肋异形截面K形相贯焊接节点进行缩尺模型试验,分析了节点在复杂受力工况下的应变发展过程,随后建立并验证了带肋异形K形相贯节点有限元模型。通过有限元计算对比分析了带肋节点和不带肋节点的应力分布、破坏模式和极限承载力,最后计算比较了节点在不同内外加劲厚度条件下的极限承载力。结果表明内、外加劲能够有效降低节点相贯区域应力,带肋节点相贯区达到材料断裂应变而发生破坏,带肋节点的极限承载力为不带肋节点的1.8倍,增大加劲板的厚度也可一定程度增大节点极限承载力。
李春权 +5 more
doaj
Refinement and Calculation Method for Stiffener Scheme for Topside Joints of Offshore Step-Up Station [PDF]
[Introduction] The topside module of an offshore step-up station usually has numerous tube-I section joints with complicated structure, which cannot be checked by general structural design software. Hence, a feasible checking design method and refinement
Fangyuan CHENG, Xuan CHEN, Zuopeng WEN
core +1 more source
为了探究钢-混凝土组合梁高强螺栓连接件在拉剪复合作用下的承载性能,采用ABAQUS有限元软件建立了推出试件有限元模型,并通过与试验结果对比验证了数值模拟的可靠性。探讨了拉拔力荷载、螺栓预拉力、混凝土强度、螺栓预留孔隙和摩擦系数等参数对极限抗剪承载力、极限滑移和滑移后刚度的影响。分析结果表明:高强螺栓连接件的抗剪承载力随着拉拔力荷载的增大而减小,随着螺栓预拉力、混凝土强度和摩擦系数的增大而提高,预留孔隙对抗剪承载力影响较小,但对刚度影响较大。提出螺栓抗拉剪共同作用承载力计算公式,在拉剪共同作用极限状态下 ...
潘晨, 邢颖, 郭琪, 刘雁斌
doaj
Determination of ultimate bearing capacity of pile under static load test based on cusp catastrophe model [PDF]
There are many analysis methods to determine the ultimate bearing capacity of single pile by using the load-settlement curve obtained from the static load test, but so far, reasonable and theoretical calculation method to solve the ultimate bearing ...
Jibao YANG
core +1 more source
Research on Axial Mechanical Properties of the Grouted Connection Section Considering Installation Errors [PDF]
[Introduction] With the development of offshore wind turbine works to deep sea areas, the challenging construction environment tends to result in errors in the installation of the grouted connection for the jacket foundation.
Cheng CHEN +4 more
core +1 more source
采用ANSYS软件建立有限元模型分析了Q460钢焊接薄壁箱形截面双向弯曲压弯构件的极限承载力。分析中考虑几何缺陷和材料缺陷,以及几何非线性和材料非线性的影响。同时,研究了构件长细比和板件宽厚比对极限承载力的影响;探明构件达到极限承载力时真实的应力分布状态;提出了采用毛截面计算其承载力的简单计算公式;收集可获得的试验结果以验证提出的计算公式。研究表明,建立的有限元模型能够很好地模拟焊接箱形截面双向偏心压弯构件的局部-整体相关屈曲性能;在大部分情况下,无量纲极限承载力与构件长细比和板件宽厚比近似为线性关系 ...
申红侠
doaj
两阶段变刚度桩筏基础承载力可靠度分析及其在高层建筑基础的应用 [PDF]
通过建立承载力计算的极限状态方程,结合工程实例,运用可靠度理论,对两阶段变刚度桩筏基础的承载力进行了可靠度分析与验证,对其安全系数指标和可靠度指标的关系进行了研究分析,得到了基于概率极限状态设计方法即现行规范《建筑结构可靠度设计统一标准》的可靠度指标,验证了采用安全系数法作为两阶段变刚度桩筏基础承载力验(计 ...
冯新建 +3 more
core
提出了一类新型预制拼装组合结构盖梁。为研究其受力机理,建立了非线性有限元模型,讨论了预制拼装组合结构盖梁破坏过程,分析了钢材强度、本构模型、腹板和顶板厚度对承载力的影响,通过理论计算对数值模拟进行了验证。研究结果表明:新型预制拼装组合盖梁先后出现混凝土开裂、腹板、顶板及加劲肋屈服、强化后达到极限承载力,表现为剪切破坏状态;试件加载中荷载-挠度曲线表现出明显的线性、塑性和加强阶段,结构屈服后有较好的延性,承载力保持逐步增长;试件腹板和混凝土承担70%~75%的极限承载力 ...
周强, 李永君, 刘思维, 刘玉擎
doaj

