Investigating the Relationship between Planning Reliability and Project Performance

open access: yes, 2008
Variability is a well-known problem in construction projects, which leads to the general deterioration of project performance. During the last decade, the Last Planner System (LPS"), a production planning and control system based on lean production ...
Alarcon, LF   +5 more
core   +1 more source

Digital Cognitive Phenotyping for Differential Diagnosis and Monitoring in Neurological Conditions

open access: yesAnnals of Clinical and Translational Neurology, EarlyView.
ABSTRACT Objective To assess the utility, accessibility, and equivalence to supervised scales of online cognitive assessment in older individuals with cognitive impairment. Methods Patients with Alzheimer's disease (AD, n = 31), idiopathic normal pressure hydrocephalus (iNPH, n = 26), and traumatic brain injury (TBI, n = 23) completed online cognitive ...
Martina Del Giovane   +10 more
wiley   +1 more source

Definition of basic and supporting parts of Alfa foils, a.s. planning system [PDF]

open access: yesActa Montanistica Slovaca, 2008
Aggregate planning cummulates into one target capacity, materials, economy and technology rules with aim to minimizesubjective approaches at the production plan designing and utilization of automatic (pseudoexpert) system for making productionplanning ...
Zuzana Marková   +2 more
doaj  

Advancing Stroke Clinical Trials Using Community Engagement and Implementation Science Approaches

open access: yesAnnals of Clinical and Translational Neurology, EarlyView.
ABSTRACT Stroke clinical trials are essential for advancing stroke care but can face challenges with recruitment, retention, clinical relevance, and translation into real‐world practice. We propose that integrating community engagement and implementation science approaches into stroke trials can help address these needs.
Lesli E. Skolarus   +2 more
wiley   +1 more source

INTEGRATED FORECASTING AND AGGREGATE PLANNING FOR PRODUCTION OPTIMIZATION: A COMPARATIVE ANALYSIS OF OVERTIME AND SUBCONTRACTING CONTROLS

open access: yesBarekeng
The current potential market demand with ever-changing situations and conditions must be managed properly to find out the potential market demand in the future.
Sukma Anindita, Rahmadi Yotenka
doaj   +1 more source

Temporal aggregation in production planning

open access: yes, 1993
In this paper, the problem of temporal aggregation in production planning is addresses. A simple facility with multiple part types is considered. The planning horizon consists of a sequence of elementary time periods and the demand for all part types is assumed to be known over these periods.
Harhalakis, G.   +3 more
openaire   +1 more source

Quantitative MRI Uncovers Subtle Cortical Damage in Myelin Oligodendrocyte Glycoprotein Antibody‐Associated Disease

open access: yesAnnals of Clinical and Translational Neurology, EarlyView.
ABSTRACT Objective To determine whether myelin‐sensitive quantitative MRI reveals microstructural abnormalities in normal‐appearing cortex (NACtx) in myelin oligodendrocyte glycoprotein antibody–associated disease (MOGAD), indicating that conventional MRI underestimates remission residual cortical injury.
Valentina Camera   +20 more
wiley   +1 more source

Aggregate production planning: an application in Özkaşıkçı Flour Mill [PDF]

open access: yes, 1996
Cataloged from PDF version of article.Includes bibliographical references leaves 52.Aggregate planning is medium-range capacity planning that typically covers a time horizon of anywhere from 3 months to 18 months.
Çağan, Alpas
core  

A matheuristic for aggregate production-distribution planning with shared resources

open access: yes, 2013
This paper discusses the aggregate production-distribution problem for a manufacturer of plastic products that are produced using injection moulding.
Dullaert, W.E.H.; id_orcid   +2 more
core   +1 more source

An interactive fuzzy approach for solving multi product, multi period production planning problem [PDF]

open access: yesMuṭāli̒āt-i Mudīriyyat-i Ṣan̒atī, 2014
Master production scheduling is a midterm phase in planning which translates the long term aggregate production planning to a plan which determines the scheduling and magnitude of different products production.
Seyed Hossein Razavi Hajiagha   +2 more
doaj  