Results 91 to 100 of about 14,813 (260)

Design of the materials experiment carrier for on-orbit servicing [PDF]

open access: yes
This paper discussed the MEC system and its mission from the viewpoint of orbit servicing. Information is provided on MEC system requirements, design for on orbit servicing, on orbit servicing operations and rationale and servicing ...
Meissinger, H. F., Waltz, D. M.
core   +1 more source

NASA Automated Rendezvous and Capture Review. Executive summary [PDF]

open access: yes
In support of the Cargo Transfer Vehicle (CTV) Definition Studies in FY-92, the Advanced Program Development division of the Office of Space Flight at NASA Headquarters conducted an evaluation and review of the United States capabilities and state-of-the-

core   +1 more source

Orbital service module systems analysis study documentation. Volume 1: Executive summary [PDF]

open access: yes
Potentially feasible system concepts for providing additional power, thermal control, and attitude to the baseline orbiter were investigated in order to support a greater variety of space missions and to extend the orbiter's ability to remain in orbit ...

core   +1 more source

Event-Sampled Adaptive Neural Automatic Berthing Control for Underactuated Ships Under FDI Attacks

open access: yesJournal of Marine Science and Engineering
This work addresses the automatic berthing control problem of underactuated ships under false data injection (FDI) attack, and an event-sampled automatic berthing control scheme is proposed.
Peng Zhang   +3 more
doaj   +1 more source

Human factors in space station architecture 1: Space station program implications for human factors research [PDF]

open access: yes
The space station program is based on a set of premises on mission requirements and the operational capabilities of the space shuttle. These premises will influence the human behavioral factors and conditions on board the space station.
Cohen, M. M.
core   +1 more source

Deployable platform systems development [PDF]

open access: yes, 1982
The long range objective is to achieve technology readiness for one or more deployable platform systems by 1986.
Jewell, R. E.
core   +1 more source

A Collaborative Berth Planning Approach for Disruption Recovery [PDF]

open access: gold, 2022
Xiaohuan Lyu   +3 more
openalex   +1 more source

Home - About - Disclaimer - Privacy