A new method for critical path method with fuzzy processing time [PDF]

open access: yesManagement Science Letters, 2011
Critical path method plays an important role on managing medium to large-scale problems. It is often difficult to determine the critical path for different reasons such as the existing uncertainties in processing tasks.
N. Shahsavari Pour   +3 more
doaj   +2 more sources

A Scheduling Model in Capturing Methane Gas from Methane Clathrates Deposits [PDF]

open access: yesЖурнал інженерних наук, 2023
The execution of any project type, especially engineering-based projects, is usually time-based, efficiency-driven, and cost-effective. These factors are the deterministic parameters that engineer successful project completion.
Anyanwu U. O., Okafor O. C., Nkwor C. A.
doaj   +1 more source

SMART CRITICAL PATH METHOD AS A MODIFIED DETAILED SCHEDULING TECHNIQUE [PDF]

open access: yesJES: Journal of Engineering Sciences, 2020
Now more Construction managers depends on scheduling tools based Critical Path Method (CPM) to can obtain total project duration plus activities’ float that leads to more efficiency for controlling and planning the studied construction projects.
Yasser M.R. Aboelmagd
doaj   +1 more source

Aircraft total turnaround time estimation using fuzzy critical path method [PDF]

open access: yesJournal of Project Management, 2022
Airport Collaborative Decision Making (ACDM) flight scheduling plans rely on accurate predictions of both optimal and reliable aircraft turnaround times, which is one of the most difficult things to complete.
Ehsan Asadi, Hartmut Fricke
doaj   +1 more source

Critical path analysis programming method without network diagram [PDF]

open access: yesMATEC Web of Conferences, 2018
Project scheduling is an important task in project management which monitors the project duration, resource utilization and affects the benefit of project for all kinds of project such as construction, IT, renewable energy, product design and ...
Hein Soe Paing, Min Htike Thein
doaj   +1 more source

Application of Critical Path Method and Fuzzy Logic in Optimizing Bottled Drinking Water Production

open access: yesInPrime, 2021
Project management is one of the analytical techniques used for planning, scheduling, and making decisions about activities. This is useful so that the project can be implemented optimally and efficiently. Project management can be done by optimizing the
Wanda Wira Yudiarti, Faiz Ainur Razi
doaj   +1 more source

Accelerate the Implementation Time of Kadiri University Clinic Constructions Projects Using Critical Path Method (CPM) [PDF]

open access: yesE3S Web of Conferences, 2021
The efficiency of project implementation time becomes one of the efforts in optimizing the use of implementation time. CPM is one of the network methods used to determine the critical path of each implementation.
Muhammad Azhari Faiz   +4 more
doaj   +1 more source

Application of fuzzy PERT method in project planning [PDF]

open access: yesTehnika, 2014
In the process of project planning, it is necessary that the project manager should carefully assess the values of the input elements of the process, which are often laden with uncertainty.
Toljaga-Nikolić Danijela V.   +3 more
doaj   +1 more source

Determining critical paths of projects by a new hybrid approach based on developed MULTIMOORA and SWARA methods under consideration of time, cost, quality, risk and safety criteria in an interval type-2 fuzzy environment [PDF]

open access: yesMuṭāli̒āt-i Mudīriyyat-i Ṣan̒atī, 2022
Critical path method is one of the most widely used approaches in planning and project control. Time is considered a determinative criterion for the critical path. But it seems necessary to regard other criteria in addition to time.
Yahya Dorfeshan   +2 more
doaj   +1 more source

Identifikasi Perilaku Perjalanan Melalui Metode Critical Path Method (CPM)

open access: yesTataloka, 2020
Mobilization in urban areas has increased every year along with the population growth and urban's development. Travel behaviors of the population in urban areas can be classified based on their travel characteristics.
Lulu Mari Fitria   +4 more
doaj   +1 more source