Results 21 to 30 of about 1,867,983 (246)

Impacts of different objective functions on resource leveling in construction projects: a case study

open access: yesJournal of Civil Engineering and Management, 2014
A review of the recent literature on the models that focus on resource leveling in Critical Path Method networks shows that different objective functions have been used to optimize resource utilization.
Atilla Damci, Gul Polat
doaj   +1 more source

P2P Based Architecture for Global Home Agent Dynamic Discovery in IP Mobility [PDF]

open access: yes, 2007
Mobility in packet networks has become a critical issue in the last years. Mobile IP and the Network Mobility Basic Support Protocol are the IETF proposals to provide mobility.
Bernardos Cano, Carlos Jesús   +4 more
core   +3 more sources

Reducing the duration of service for passengers of departure flight and evaluating the cost of the service process

open access: yesИнтеллект. Инновации. Инвестиции, 2019
The main factor of increasing acceptance rate is to reduce the duration of passenger service of the departing flight. Improving the processes of servicing departing passengers helps to improve the competitive position of the airport. The object of the
S.A. Kropiventseva, M.A. Sedova
doaj   +1 more source

TIME CONTROL AND RESCHEDULING USING METHOD CPM (CRITICAL PATH METHOD)

open access: yesJurnal Civil Engineering Study
In some development projects, finishing the work inside a restricted time is normal. This can never again be kept away from after the utilization of labor with is presently not equally.
Almuntofa Purwantoro   +2 more
doaj   +1 more source

Analysis of Additional Time Costs Construction of the Religious Court Office Building of Trenggalek Regency, East Java

open access: yesIndonesian Interdisciplinary Journal of Sharia Economics
This study discusses several ways to accelerate the building construction process. The study used two methods, namely crashing and overlapping. The crashing method involves adding overtime hours and labor to shorten the project duration.
Nidya Widyaningsari   +2 more
doaj   +1 more source

Path optimization method for the sign problem

open access: yes, 2017
We propose a path optimization method (POM) to evade the sign problem in the Monte-Carlo calculations for complex actions. Among many approaches to the sign problem, the Lefschetz-thimble path-integral method and the complex Langevin method are promising
Kashiwa, Kouji   +2 more
core   +1 more source

ANALISIS PENJADWALAN ULANG UNTUK MENEKAN BIAYA AKIBAT KETERLAMBATAN PROYEK PEMBANGUNAN KAPAL PATROLI

open access: yesKapal, 2014
Keterlambatan proyek pembangunan Patroli boat 15 meter 2 (unit) di PT. Mahayala Utama Jakarta dapat meningkatkan biaya produksi kapal yang berakhir pada meruginya perusahaan.
Ahmad Fauzan Zakki   +2 more
doaj   +1 more source

Method for reducing cloud workflow completion time under the task interruption

open access: yes网络与信息安全学报, 2020
As more and more large-scale scientific workflows are delivered to clouds, the business model of workflow-as-a-service is emerging. But there are many kinds of threats in the cloud environment, which can interrupt the task execution and extend the ...
Yawen WANG, Yunfei GUO, Wenyan LIU, Shumin HUO
doaj   +1 more source

Analisis Manajemen Konstruksi Jembatan Kenet Bantul Daerah Istimewa Yogyakarta

open access: yesJurnal Civil Engineering Study, 2023
Manajemen konstruksi adalah studi dan praktik manajemen dan aspek teknis industri konstruksi. Manajemen konstruksi juga dapat diartikan sebagai modal komersial yang dilakukan oleh konsultan konstruksi dalam memberi nasihat dan membantu dalam proyek ...
Ohan Farhan
doaj   +1 more source

Network Method Critical Path as a Search Problem Solvers Critical Path [PDF]

open access: yes, 2005
Activity is a lot of work takes time, energy and capital. Many companies do a lot of unplanned activities with a working method so that his workers are not finished just because time. This is much work other jobs to do and finished at the same time while
Fachrudin, F. (Fachrudin)
core  