Results 11 to 20 of about 200,383 (269)

Quality of life among patients with epilepsy in the western region of KSA: A cross-sectional study [PDF]

open access: yesJournal of Taibah University Medical Sciences
الملخص: الخلفية: على الرغم من إمكانية إدارة الصرع، إلا أنه يؤثر بشكل كبير على جودة حياة الأفراد، والتي تتأثر بعوامل مثل شدة النوبات والوصمة الاجتماعية. تناولت هذه الدراسة جودة الحياة لدى مرضى الصرع المقيمين في المنطقة الغربية من المملكة العربية السعودية.
Bayan M. Almarwani, MD   +6 more
doaj   +2 more sources

Earned duration management for a student association project [PDF]

open access: yes, 2017
Vanhoucke, Mario   +6 more
openaire   +3 more sources

Integrated EDM and 4D BIM-Based Decision Support System for Construction Projects Control

open access: yesBuildings, 2022
Project schedule monitoring and controlling are critical challenges of construction project management that are not adequately implemented, likely due to the predominance of earned value management and the lack of utilizing technology, such as BIM tools.
Hassan Mohamed Ayman   +2 more
doaj   +1 more source

CONSTRUCTION PROJECT CONTROL ANALYSIS USING EARNED VALUE MANAGEMENT, EARNED SCHEDULE MANAGEMENT, EARNED DURATION MANAGEMENT

open access: yesJurnal Infrastruktur, 2023
Appropriate control methods are needed to anticipate potential problems and make construction projects better managed to improve efficiency, productivity, and quality of work. Earned Value Management (EVM) experienced problems in predicting duration because it used two scopes, namely cost and schedule.
Azaria Andreas   +2 more
openaire   +1 more source

Cost Reduction Techniques in Public Higher Educational Buildings in Southwestern Nigeria: Awareness Among Project Participants [PDF]

open access: yesE3S Web of Conferences, 2023
Building projects delivered within higher educational institutions are often left unfinished or finished more than the initial cost, exceeding the duration and not up to standard.
Akinola Gbemisola   +3 more
doaj   +1 more source

FORECASTING AND DETERMINING OF COST PERFORMANCE INDEX OF TUNNELS PROJECTS USING ARTIFICIAL NEURAL NETWORKS

open access: yesInternational Journal for Computational Civil and Structural Engineering, 2022
Construction projects, especially tunnel projects in the Arab world, suffer from poor documentation of data and information, and therefore there is a difficulty in estimating the budget or total costs or indicators of earned value, and with the ...
Oday Hammoody   +3 more
doaj   +1 more source

Use of the EVM method for analysis of extending the construction project duration as a result of realization disturbances - case study [PDF]

open access: yesArchives of Civil Engineering, 2021
In pursuing numerous construction projects, investors and contractors regularly face construction delay problems, many of which are likely to have been avoidable.
Anna Starczyk-Kołbyk, Leopold Kruszka
doaj   +1 more source

Randomized Earned Value Method for the rolling assessment of construction projects advancement [PDF]

open access: yesArchives of Civil Engineering, 2022
The Randomized Earned Value Method enable to control the time and cost of works during the implementation of a construction project. The method allows to assess the compliance of the current advancement in time and actually incurred costs with the ...
Tadeusz Kasprowicz   +1 more
doaj   +1 more source

EVALUASI EFEKTIVITAS KEPUTUSAN ADDENDUM PROYEK TERHADAP WAKTU PEKERJAAN PROYEK BERBASIS EARNED VALUE METHOD

open access: yesJ@ti Undip: Jurnal Teknik Industri, 2023
Tantangan terbesar yang ada pada industri proyek konstruksi adalah menjaga kualitas mutu, biaya dan waktu proyek konstruksi. Kegiatan proyek sangat dipengaruhi oleh sistem penjadwalan dan durasi proyek.
Ridhwan Dwi Dharmawan   +2 more
doaj   +1 more source

Stability and accuracy of deterministic project duration forecasting methods in earned value management

open access: yesEngineering, Construction and Architectural Management, 2021
Purpose Earned Value Management (EVM) is a project monitoring and control technique that enables the forecasting of a project's duration. Many EVM metrics and project duration forecasting methods have been proposed. However, very few studies have compared their accuracy and stability.
Alexis Barrientos-Orellana   +4 more
openaire   +3 more sources

Home - About - Disclaimer - Privacy