A comprehensive framework for evaluating bridge project rework through earned value management (EVM) and building information modeling (BIM) [PDF]
Rework represents a significant challenge to the successful delivery of bridge projects, with substantial implications for cost, schedule, and resource efficiency.
Sara M. Elseufy +2 more
doaj +4 more sources
The Enhanced-Earned Value Management (E-EVM) Model: A Proposal for the Aerospace Industry [PDF]
The framework of this paper is the aerospace industry, which is one of the world’s leading sectors, thus playing a noteworthy role in current society. This makes it especially important to try to optimize the management of the aerospace sector. Therefore, the main objective of this paper is to propose the so-called Enhanced-Earned Value Management ...
Juan Carlos Meléndez Rodríguez +2 more
exaly +5 more sources
Earned Value Method (EVM) for Construction Projects: Current Application and Future Projections
The earned value method (EVM) is an internationally known technique for project management that emphasizes the control of project cost performance and duration, thus allowing trends to be identified during execution and warning the project manager of ...
Mayra Proaño-Narváez +3 more
doaj +3 more sources
An application of Earned Value Management (EVM) with Monte Carlo simulation in engineering project management [PDF]
The fast changes in the Market make companies increasingly focus on project structures. A project differs from a routine activity because it is unique and must be managed and structured to provide expected benefits at no greater cost than anticipated ...
Felipe Kahan Bonato +2 more
doaj +3 more sources
Stochastic Earned Duration Analysis for Project Schedule Management
Earned duration management (EDM) is a methodology for project schedule management (PSM) that can be considered an alternative to earned value management (EVM).
Fernando Acebes +3 more
doaj +3 more sources
Modeling Sustainable Earned Value Management (EVM) Under Grey Uncertain Conditions
The EVM method is an essential project management technique that compares the work done to the planned values (PVs) to identify project variances. However, the inherent uncertainties and possibilities in the project introduce uncertainty in the input ...
Lei Fan +4 more
doaj +2 more sources
Lean project planning – Bridging last planner system and earned value management [PDF]
Earned Value Management (EVM) has become a de facto standard for project planning after decades of applications worldwide, and most industry contracts that require some of the reporting features of EVM.
Jan Emblemsvåg
doaj +2 more sources
Automated conceptual earned value management [PDF]
Traditional Earned Value Management (EVM) is one of the most widely adopted project-control methodologies; however, its application is fundamentally constrained during the conceptual stage because reliable cost, schedule, variance, and risk assessments ...
Haytham Elmousalami, Abdulaziz Alotaibi
doaj +2 more sources
Developing a construction waste management performance calculator for highway construction [PDF]
The generation of a substantial amount of construction waste (CW) poses significant challenges to the green transition of highway construction projects. However, the construction industry lacks integration of construction waste management (CWM) practices
Zhizhe Zheng +3 more
doaj +2 more sources
Incorporating earned value management into income statements to improve project management profitability and elevate application in the business and management. [PDF]
Our goal is to improve Project Management (PM) profitability and reduce discrepancies in information among stakeholders, which can result in conflicts. This will be accomplished by incorporating Earned Value Management (EVM) with the Income Statement and
Rudy Setyopurnomo +3 more
doaj +2 more sources