Using Earned Value Management (EVM) in Spiral Development [PDF]
Earned Value Management (EVM) helps managers to plan, monitor, and control the development and evolution of custom developed software-intensive systems. EVM assumes a waterfall development model. However, to meet the demands for today's complex, dynamic systems, certain trends have emerged.
Brownsword, Lisa, Smith, James
core +3 more sources
ANALISIS BIAYA DAN WAKTU MENGGUNAKAN METODE EVM (EARNED VALUE MANAGEMENT)
Pada dunia konstruksi sangat sering mengalami keterlambatan pada saat pelaksanaan dimana realisasi dilapangan tidak sesuai jadwal rencana. Disebabkan beberapa faktor yang terjadi meskipun sudah dipersiapkan rencana secara matang namun pada praktik dilapangan masih banyak timbul masalah dalam pelaksanaan. Maka digunakanlah salah satu metode yaitu Metode
Pelangi Putri Febrianti, Brian Alfandi
openaire +3 more sources
Earned Value Management Agent-Based Simulation Model
Agile project management (APM) can be defined as an iterative approach that promotes satisfying customer requirements, adjusts to change, and develops a working product in rapidly changing environments.
Manuel Castañón-Puga +5 more
doaj +2 more sources
Reduced energy consumption is a key aspect of the green building. Nonetheless, research indicates that there is a performance gap between the predicted and the actual energy performance once buildings are occupied, which implies a cost deviation from the
Luay N. Dwaikat, Kherun N. Ali
doaj +3 more sources
A game-based learning method to teach project management – the case of the earned value management [PDF]
The earned value management (EVM) is a project management method for monitoring and controlling project expenditure and progress. Teaching EVM is challenging as the method may appear theoretical, mathematical, and disconnected from the uncertainty of ...
Elina Jääskä +2 more
doaj +2 more sources
Interpretive structural modeling in Earned Value Management
The primary purpose of the current study is introducing a comprehensive approach to identify the relationship among different criteria in Earned Value Management (EVM).
Morteza Bagherpour +3 more
doaj +3 more sources
Cost Early-Warning Model System of Large-Scale Construction Project. [PDF]
China’s construction industry has been suffering from high cost, high efficiency, and maladjustment of management. The traditional management mode makes the construction project face the risk of cost overruns and delays, which cannot achieve the effect of cost control.
Dai J, Ke D.
europepmc +2 more sources
Antimicrobial Usage in Smallholder Poultry Production in Nigeria. [PDF]
The indiscriminate use of antimicrobials in livestock production is of increasing concern due to the threat of antimicrobial resistance in both humans and animals. Much emphasis has been placed on intensively managed poultry production systems, which routinely use antimicrobials as against smallholder poultry production systems (SPPS).
Bamidele O +7 more
europepmc +2 more sources
Building maintenance is a critical element of asset management to ensure functional feasibility, safety, and operational efficiency. This study evaluates the effectiveness of implementing Earned Value Management (EVM) in the maintenance project of Building 4, Universitas Muhammadiyah Malang (GKB 4 UMM), based on the Building Maintenance and Care ...
Sandi Wahyudiono, Rini Pebri Utari
openaire +2 more sources
One of the persistent challenges in the construction industry is accurately estimating time and costs for civil engineering projects. Inadequate planning in these areas can lead to unexpected expenses and delays.
Ahmed Rasul Hussein, Sina Fard Moradinia
doaj +1 more source