Results 11 to 20 of about 13,645,553 (193)

Using Earned Value Management (EVM) in Spiral Development [PDF]

open access: yes, 2005
Earned Value Management (EVM) helps managers to plan, monitor, and control the development and evolution of custom developed software-intensive systems. EVM assumes a waterfall development model. However, to meet the demands for today's complex, dynamic systems, certain trends have emerged.
Brownsword, Lisa, Smith, James
core   +3 more sources

ANALISIS BIAYA DAN WAKTU MENGGUNAKAN METODE EVM (EARNED VALUE MANAGEMENT) [PDF]

open access: yesStructure, 2023
Pada dunia konstruksi sangat sering mengalami keterlambatan pada saat pelaksanaan dimana realisasi dilapangan tidak sesuai jadwal rencana. Disebabkan beberapa faktor yang terjadi meskipun sudah dipersiapkan rencana secara matang namun pada praktik dilapangan masih banyak timbul masalah dalam pelaksanaan. Maka digunakanlah salah satu metode yaitu Metode
Pelangi Putri Febrianti, Brian Alfandi
openaire   +2 more sources

Failure Case of Earned Value Method (EVM): The “Absurd” of the Use of Management & Contingency Reserves Budgeting

open access: yesBaltic Journal of Real Estate Economics and Construction Management, 2022
The object of the research focuses on the use and application of the management reserves and contingencies of the hierarchical structure of the Earned Value Management System framework. The study explores logical failures of the method, which do not seem
Metallinos Pavlos
doaj   +2 more sources

Measuring the Actual Energy Cost Performance of Green Buildings: A Test of the Earned Value Management Approach

open access: yesEnergies, 2016
Reduced energy consumption is a key aspect of the green building. Nonetheless, research indicates that there is a performance gap between the predicted and the actual energy performance once buildings are occupied, which implies a cost deviation from the
Luay N. Dwaikat, Kherun N. Ali
doaj   +3 more sources

Evaluasi Kinerja Proyek Pemeliharaan Jalan Menggunakan Metode Earned Value Management (EVM)

open access: yesNumerical: Jurnal Matematika dan Pendidikan Matematika
This research aims to analyze the cost and time performance of the Bojonegoro–Ponco road maintenance project using the Earned Value Management (EVM) method. This method is used to evaluate project achievement by comparing the Planned Value (PV), Earned Value (EV/BCWP), and Actual Cost (AC) to determine cost efficiency and schedule accuracy. .
Novi Nur Ma’rifatul Qomariah   +1 more
core   +3 more sources

Cost Early-Warning Model System of Large-Scale Construction Project. [PDF]

open access: yesComput Intell Neurosci, 2022
China’s construction industry has been suffering from high cost, high efficiency, and maladjustment of management. The traditional management mode makes the construction project face the risk of cost overruns and delays, which cannot achieve the effect of cost control.
Dai J, Ke D.
europepmc   +2 more sources

Antimicrobial Usage in Smallholder Poultry Production in Nigeria. [PDF]

open access: yesVet Med Int, 2022
The indiscriminate use of antimicrobials in livestock production is of increasing concern due to the threat of antimicrobial resistance in both humans and animals. Much emphasis has been placed on intensively managed poultry production systems, which routinely use antimicrobials as against smallholder poultry production systems (SPPS).
Bamidele O   +7 more
europepmc   +2 more sources

Mitigating Time and Cost Overruns in Construction Projects: A Questionnaire Study on Integrating Earned Value Management and Risk Management

open access: yesJournal of Studies in Science and Engineering, 2023
One of the persistent challenges in the construction industry is accurately estimating time and costs for civil engineering projects. Inadequate planning in these areas can lead to unexpected expenses and delays.
Ahmed Rasul Hussein, Sina Fard Moradinia
doaj   +1 more source

Earned Value Management Agent-Based Simulation Model

open access: yesSystems, 2023
Agile project management (APM) can be defined as an iterative approach that promotes satisfying customer requirements, adjusts to change, and develops a working product in rapidly changing environments.
Manuel Castañón-Puga   +5 more
doaj   +1 more source

EVALUASI EFEKTIVITAS KEPUTUSAN ADDENDUM PROYEK TERHADAP WAKTU PEKERJAAN PROYEK BERBASIS EARNED VALUE METHOD

open access: yesJ@ti Undip: Jurnal Teknik Industri, 2023
Tantangan terbesar yang ada pada industri proyek konstruksi adalah menjaga kualitas mutu, biaya dan waktu proyek konstruksi. Kegiatan proyek sangat dipengaruhi oleh sistem penjadwalan dan durasi proyek.
Ridhwan Dwi Dharmawan   +2 more
doaj   +1 more source

Home - About - Disclaimer - Privacy