Results 41 to 50 of about 13,645,553 (193)

Review of Earned Value Management (EVM) tool for project management [PDF]

open access: yes, 2018
This paper presents a review of an Earned Value Management System (EVM) for assessing project performance compared to others methodology. This study attempts to solve problem to the project manager and project stake holder in handling complicated ...
Mohd Ariffin, Mohd Khairol Anuar   +1 more
core   +1 more source

Cost performance index stability: insights from environmental remediation projects [PDF]

open access: yesJournal of Defense Analytics and Logistics, 2018
Purpose – The purpose of this study was to investigate the stability of the cost performance index (CPI) for environmental remediation projects as the topic is not addressed in the literature.
Denis S. Clayson   +2 more
doaj   +1 more source

Beyond Content Digitization: A Smart Contract‐Based Solution for Ownership and Motivation in Online Learning (Course‐Chain)

open access: yesJournal of Computer Assisted Learning, Volume 42, Issue 5, October 2026.
ABSTRACT Introduction With the advancement of the digital age, traditional face‐to‐face education and training programs have been increasingly replaced by online courses, which consist of live digital lectures and pre‐recorded video content. However, although online course platforms have succeeded in digitizing the essential requirements of traditional
Süleyman Can Tuğcu   +2 more
wiley   +1 more source

Perceived organizational exploitation and employee health: An examination of processes and boundary conditions

open access: yesJournal of Occupational and Organizational Psychology, Volume 99, Issue 1, March 2026.
Abstract Recent research has argued that exploitative working relationships can be present in any context and experienced by any employee, and their forms can range from extreme to subtle. Drawing on the Conservation of Resources theory, we argue that, through the depletion of resources, employees' perceived organizational exploitation is likely to ...
Sandra Costa   +3 more
wiley   +1 more source

An Effective Earned Value Management System (EVMS) is a Team Sport

open access: yesProject Management Journal
We present a novel framework to assess 27 earned value management system (EVMS) environment factors and investigate their impact on project performance. A study of the EVMS literature, a survey of practitioners, and focus group meetings with 36 EVMS industry and government experts, supported the development of the framework.
Vartenie Aramali   +3 more
openaire   +1 more source

Evaluation Performance for Iraqi Oil Projects Using Earned Value Analysis

open access: yesTikrit Journal of Engineering Sciences
Poor performance measuring procedures in the oil and gas sector can result in project cost overruns, schedule delays, and scope expansions. Earned value management, an integrated project planning and control system that monitors cost and schedule ...
Nidal Adnan Jasim   +2 more
doaj   +1 more source

Productivity Analysis for Performance Measurement by (Earned Value Management) EVM in High-Level Building Projects

open access: yesInternational Journal of Engineering Research and Advanced Technology, 2020
Project scheduling helps show the relationship of each activity to other activities and to the entire project, identifies relationships that should take precedence between activities, and shows a realistic estimated time for each activity. EVM (Earned Value Management) is one of the measurement methods to objectively measure project performance and ...
Dirga Oktrianto, Budi Susetyo
openaire   +2 more sources

Road Construction Projects: Establishment of Project Management 4.0 Maturity Level From Industry 4.0 Transformation

open access: yesAdvances in Civil Engineering, Volume 2026, Issue 1, 2026.
The adoption of Industry 4.0 (I4.0) technologies within the construction sector has outpaced the development of empirical frameworks for the assessment of Project Management 4.0 (PM4.0) for digital transformation, especially for road construction projects (RCPs) in developing economies.
Kennedy Josephat   +2 more
wiley   +1 more source

Earned Value Management (EVM) System Description [PDF]

open access: yes, 2019
The purpose of this Earned Value Management (EVM) System Description is to provide guidance in NASAs Earned Value Management Capability for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and ...
Schumann, Deborah C.
core  

A Scoping Review to Conceptualize Social Privilege for Studying Patients’ Health Outcomes and Health Disparities

open access: yesAdvances in Public Health, Volume 2026, Issue 1, 2026.
Background The continued reliance on single‐category self‐reported demographic data (e.g., race/ethnicity) reflects conceptual limitations that hinder the study and understanding of health outcomes research. There is a pressing need for more precise measures of social privilege that conceptualize privilege and oppression while enabling the examination ...
Elizabeth A. Brown   +5 more
wiley   +1 more source

Home - About - Disclaimer - Privacy