FORECASTING AND DETERMINING OF COST PERFORMANCE INDEX OF TUNNELS PROJECTS USING ARTIFICIAL NEURAL NETWORKS

open access: yesInternational Journal for Computational Civil and Structural Engineering, 2022
Construction projects, especially tunnel projects in the Arab world, suffer from poor documentation of data and information, and therefore there is a difficulty in estimating the budget or total costs or indicators of earned value, and with the ...
Oday Hammoody   +3 more
doaj   +1 more source

Forecasting project schedule performance using probabilistic and deterministic models

open access: yesHBRC Journal, 2014
Earned value management (EVM) was originally developed for cost management and has not widely been used for forecasting project duration. In addition, EVM based formulas for cost or schedule forecasting are still deterministic and do not provide any ...
S.A. Abdel Azeem   +2 more
doaj   +1 more source

Use of the EVM method for analysis of extending the construction project duration as a result of realization disturbances - case study [PDF]

open access: yesArchives of Civil Engineering, 2021
In pursuing numerous construction projects, investors and contractors regularly face construction delay problems, many of which are likely to have been avoidable.
Anna Starczyk-Kołbyk, Leopold Kruszka
doaj   +1 more source

A modified earned value management using activity based costing [PDF]

open access: yesJournal of Project Management, 2016
Earned Value Management (EVM) has been a well-known methodology used since the 1960s when the US department of defense proposed a standard method to measure project perfor-mance. This system relies on a set of often straightforward metrics to measure and
Vahid Aminian   +3 more
doaj   +1 more source

Estimating Construction Project Duration and Costs upon Completion Using Monte Carlo Simulations and Improved Earned Value Management

open access: yesBuildings, 2022
Earned value management (EVM) is widely used when monitoring and estimating operations related to construction projects. As the scope and complexity of construction projects expand, traditional EVM is sometimes ineffective and even results in conclusions
Jie Deng, Wei Jian
doaj   +1 more source

Cost performance index stability: insights from environmental remediation projects [PDF]

open access: yesJournal of Defense Analytics and Logistics, 2018
Purpose – The purpose of this study was to investigate the stability of the cost performance index (CPI) for environmental remediation projects as the topic is not addressed in the literature.
Denis S. Clayson   +2 more
doaj   +1 more source

Combining EDM and EVM a proposal simplification for project time and cost management

open access: yes, 2017
Earned value management (EVM), a technique mainly used to manage project cost, was developed during the second half of the twentieth century by an agency of the USA government.
De Andrade, Paulo André   +1 more
core   +1 more source

Risk factors affecting the ability for earned value management to accurately assess the performance of infrastructure projects in Australia [PDF]

open access: yes, 2019
Purpose – The purpose of this paper is to investigate a set of risk-related factors influencing the earned value management (EVM) concept as an assessment technique in evaluating the progress of modern sustainable infrastructure construction projects ...
Thorpe, David   +2 more
core   +1 more source

MEMAHAMI DAN MENGHUBUNGKAN METRIK EVM DENGAN SKEDUL PROYEK KONSTRUKSI

open access: yesJurnal Ilmiah Teknik Sipil, 2018
Earned Value Management (EVM) merupakan model yang dikenal sebagai alat bantu manajer untuk mengidentifkasi dan mengendalikan masalah-masalah dalam pelaksanaan konstruksi sebelum terjadi.
I Gusti Agung Adnyana Putera
doaj   +1 more source

Productivity Analysis for Performance Measurement by (Earned Value Management) EVM in High-Level Building Projects

open access: yesInternational Journal of Engineering Research and Advanced Technology, 2020
Project scheduling helps show the relationship of each activity to other activities and to the entire project, identifies relationships that should take precedence between activities, and shows a realistic estimated time for each activity. EVM (Earned Value Management) is one of the measurement methods to objectively measure project performance and ...
Dirga Oktrianto, Budi Susetyo
openaire   +2 more sources