Risk factors affecting the ability for earned value management to accurately assess the performance of infrastructure projects in Australia [PDF]

open access: yes, 2019
Purpose – The purpose of this paper is to investigate a set of risk-related factors influencing the earned value management (EVM) concept as an assessment technique in evaluating the progress of modern sustainable infrastructure construction projects.
Ibrahim, Maan Nihad   +2 more
core   +2 more sources

A game-based learning method to teach project management – the case of the earned value management

open access: yesCogent Education, 2023
The earned value management (EVM) is a project management method for monitoring and controlling project expenditure and progress. Teaching EVM is challenging as the method may appear theoretical, mathematical, and disconnected from the uncertainty of ...
Elina Jääskä   +2 more
doaj   +1 more source

MONITORING AND CONTROL SYSTEM OF THE STAKEHOLDERS ACTIVITIES FOR PROJECT BASED ON THE EARNED DURATION MANAGEMENT METHOD

open access: yesМодернизация, инновация, развитие, 2018
Purpose: the purpose of the article is to describe the Earned Duration Management method in relation to individual phases of the project and the project as a whole.
R. Yu. Dashkov, A. V. Tislenko
doaj   +1 more source

Comparison of the Stability and Accuracy of Deterministic Project Cost Prediction Methods in Earned Value Management

open access: yesBuildings, 2023
Completing a project on time and on budget are essential factors for the success of any project. One technique that allows predicting the final cost of a project is earned value management (EVM).
Alexis Barrientos-Orellana   +4 more
doaj   +1 more source

Interpretive structural modeling in Earned Value Management

open access: yesJournal of Civil Engineering and Management, 2020
The primary purpose of the current study is introducing a comprehensive approach to identify the relationship among different criteria in Earned Value Management (EVM).
Morteza Bagherpour   +3 more
doaj   +1 more source

FORECASTING AND DETERMINING OF COST PERFORMANCE INDEX OF TUNNELS PROJECTS USING ARTIFICIAL NEURAL NETWORKS

open access: yesInternational Journal for Computational Civil and Structural Engineering, 2022
Construction projects, especially tunnel projects in the Arab world, suffer from poor documentation of data and information, and therefore there is a difficulty in estimating the budget or total costs or indicators of earned value, and with the ...
Oday Hammoody   +3 more
doaj   +1 more source

An overview of recent research results and future research avenues using simulation studies in project management [PDF]

open access: yes, 2013
This paper gives an overview of three simulation studies in dynamic project scheduling integrating baseline scheduling with risk analysis and project control. This integration is known in the literature as dynamic scheduling.
Vanhoucke, Mario
core   +4 more sources

Forecasting project schedule performance using probabilistic and deterministic models

open access: yesHBRC Journal, 2014
Earned value management (EVM) was originally developed for cost management and has not widely been used for forecasting project duration. In addition, EVM based formulas for cost or schedule forecasting are still deterministic and do not provide any ...
S.A. Abdel Azeem   +2 more
doaj   +1 more source

Use of the EVM method for analysis of extending the construction project duration as a result of realization disturbances - case study [PDF]

open access: yesArchives of Civil Engineering, 2021
In pursuing numerous construction projects, investors and contractors regularly face construction delay problems, many of which are likely to have been avoidable.
Anna Starczyk-Kołbyk, Leopold Kruszka
doaj   +1 more source

An earned schedule-based regression model to improve cost estimate at completion [PDF]

open access: yes, 2014
Traditional Earned Value Management (EVM) index-based methods for Cost Estimate at Completion (CEAC) of an ongoing project have been known for their limitations inherent with both the assumption that past EVM data is the best available information and ...
De Marco, Alberto, Narbaev, Timur
core   +1 more source