Results 21 to 30 of about 1,390,070 (345)

A New Approach to Z-number Based Earned Value Management

open access: yesFuzzy Information and Engineering, 2022
Purpose: We propose an extension of the Earned Value method that takes into account both intangible and undocumented factors of project cost increase that occur during project execution and the credibility/reliability of cost estimations.Methodology ...
Dorota Kuchta, Adam Zabor
doaj   +1 more source

A modified earned value management using activity based costing [PDF]

open access: yesJournal of Project Management, 2016
Earned Value Management (EVM) has been a well-known methodology used since the 1960s when the US department of defense proposed a standard method to measure project perfor-mance. This system relies on a set of often straightforward metrics to measure and
Vahid Aminian   +3 more
doaj   +1 more source

MONITORING AND CONTROL SYSTEM OF THE STAKEHOLDERS ACTIVITIES FOR PROJECT BASED ON THE EARNED DURATION MANAGEMENT METHOD

open access: yesМодернизация, инновация, развитие, 2018
Purpose: the purpose of the article is to describe the Earned Duration Management method in relation to individual phases of the project and the project as a whole.
R. Yu. Dashkov, A. V. Tislenko
doaj   +1 more source

Management model of investment projects using the earned value method [PDF]

open access: yesMining and Metallurgy Engineering Bor, 2013
The Earned Value Method represents a relatively new project management tool, which uses the information on costs, time schedule and operating performance in order to determine the current status of the project.
Stojanović Cvjetko, Ostojić Ivana
doaj   +1 more source

Earned Value Management System in Indonesian Construction Projects

open access: yesInternational Journal of Integrated Engineering, 2021
Earned Value Management (EVM) is a methodology combining scope, schedule, and resource measurements to assess project performance and progress. It involves integrating the three critical elements of the project covering schedule, work scope, and cost ...
Mandiyo Priyo
semanticscholar   +1 more source

Using Earned Value Management with exponential smoothing technique to forecast project cost

open access: yes, 2021
Earned value management (EVM) is developed for cost management and is widely used to evaluate and forecast project cost. Through earned value management, we can calculate the deviation between cost and schedule, as well as performance indicators such as ...
Mengyuan Zhao, Xuemin Zi
semanticscholar   +1 more source

The Enhanced-Earned Value Management (E-EVM) Model: A Proposal for the Aerospace Industry

open access: yesSymmetry, 2021
The framework of this paper is the aerospace industry, which is one of the world’s leading sectors, thus playing a noteworthy role in current society. This makes it especially important to try to optimize the management of the aerospace sector. Therefore,
Joaquín López-Pascual   +2 more
semanticscholar   +1 more source

FORECASTING AND DETERMINING OF COST PERFORMANCE INDEX OF TUNNELS PROJECTS USING ARTIFICIAL NEURAL NETWORKS

open access: yesInternational Journal for Computational Civil and Structural Engineering, 2022
Construction projects, especially tunnel projects in the Arab world, suffer from poor documentation of data and information, and therefore there is a difficulty in estimating the budget or total costs or indicators of earned value, and with the ...
Oday Hammoody   +3 more
doaj   +1 more source

CONSTRUCTION PROJECT CONTROL ANALYSIS USING EARNED VALUE MANAGEMENT, EARNED SCHEDULE MANAGEMENT, EARNED DURATION MANAGEMENT

open access: yesJurnal Infrastruktur, 2023
Appropriate control methods are needed to anticipate potential problems and make construction projects better managed to improve efficiency, productivity, and quality of work. Earned Value Management (EVM) experienced problems in predicting duration because it used two scopes, namely cost and schedule.
Azaria Andreas   +2 more
openaire   +1 more source

Stability and accuracy of deterministic project duration forecasting methods in earned value management

open access: yes, 2021
PurposeEarned Value Management (EVM) is a project monitoring and control technique that enables the forecasting of a project's duration. Many EVM metrics and project duration forecasting methods have been proposed. However, very few studies have compared
Alexis Barrientos-Orellana   +4 more
semanticscholar   +1 more source

Home - About - Disclaimer - Privacy