Results 51 to 60 of about 178 (163)
This paper addresses the challenge of providing liquidity in automated market makers (AMMs) for tokens with low trading volumes. Our solution involves consolidating currency reserves from multiple trading pairs and algorithmically allocating them to each pair.
Srisht Fateh Singh +2 more
wiley +1 more source
The development of projects in the naval field is of crucial importance for the industry. Their success depends on how their costs and duration are managed. The study aims to present how naval projects can be monitored using Earned Value Management (EVM),
Dragoș Damianov, Carmen Gasparotti
doaj +1 more source
An Effective Earned Value Management System (EVMS) is a Team Sport
We present a novel framework to assess 27 earned value management system (EVMS) environment factors and investigate their impact on project performance. A study of the EVMS literature, a survey of practitioners, and focus group meetings with 36 EVMS industry and government experts, supported the development of the framework.
Vartenie Aramali +3 more
openaire +1 more source
Cost management is a crucial component of construction project management, which assumes an increasingly critical role in modern large‐scale projects. Ideally, cost management is achieved through a comparison between the current cost and the predetermined cost schedule.
Tianyu Liu +3 more
wiley +1 more source
Determining Cost and Time Performance Indexes for Diversified Investment Tasks
The aim of the research results presented in the article was to develop a method that enables the analysis and evaluation of deviations at the stage of implementing a construction investment in various construction sectors.
Jarosław Konior
doaj +1 more source
PELAKSANAAN PENGENDALIAN PROYEK MENGGUNAKAN METODE EARNED VALUE MANAGEMENT (EVM)
Sumber daya utama yang terbatas pada tahap pelaksanaan proyek adalah biaya, kualitas, dan waktu. Perencanaan, penjadualan, dan pengendalian adalah langkah penting untuk dilakukan agar tujuan proyek dapat dicapai. Digunakan untuk mengukur kinerja dan kemajuan proyek, metode Earned Value Management (EVM) membandingkan nilai pekerjaan yang sebenarnya ...
Dliya Ramadhani +8 more
openaire +1 more source
With the increasing demand for electricity in modern society, the scale of substation construction projects has greatly expanded, and the ever-increasing technical requirements have led to rising project costs year by year.
Hongyan Xin +3 more
doaj +1 more source
Eliminating Sub-Optimality in Earned Value Management Scheduling
Strategic and operational project successes rely on optimal implementation, with time-to-execution being a key value driver and competitive advantage. Earned Value Management (EVM) is the most pervasive approach to scheduling and cost monitoring in large-
C. Capone, G. Kretzschmar, T. Narbaev
doaj +1 more source
Critical paths are widely used in project schedule management, but most existing studies ignore the volatility and dynamic characteristics of project duration, which increases the risk of project implementation. This paper proposes a dynamic optimization
Ping Cao +4 more
doaj +1 more source
Application of Project Management Control Mechanisms in Construction Projects: A Case of Portharcourt, Rivers State, Nigeria [PDF]
The construction industry being an industry where large scale projects are undertaken and for the projects to be successfully completed, the right project control mechanism is needed for the achievement of informed decisions.
Ogbonna Achimba Chibueze +5 more
doaj +1 more source

