Results 121 to 130 of about 7,605 (190)

eMBB development and test plan

open access: yes
The deliverable will define the trial plan for eMBB, and in particular for the spectrum band at 3.5GHz. The test will cover massive MIMO beamforming, network slicing, and latency measurement with MEC, transport network and spectrum usage. The test campaign will be defined in this deliverable.
openaire   +1 more source

The microevolutionary trajectory of endemic multidrug-resistant tuberculosis strains in Portugal toward increased drug resistance levels and its clinical significance. [PDF]

open access: yesFront Microbiol
Gomes P   +9 more
europepmc   +1 more source

Business, Operational and Technical Requirements for Satellite eMBB

open access: yes
Defines the business, operational and technical requirements for the SaT5G scenarios identified in D2 ...
openaire   +1 more source

Home - About - Disclaimer - Privacy