Results 11 to 20 of about 5,634,113 (341)

Failure Rate Prediction Model of Substation Equipment Based on Weibull Distribution and Time Series Analysis

open access: yesIEEE Access, 2019
The failure rate is an important indicator to assess the reliability of substation equipment, and the failure rate prediction is an effective way to master the operation status of substation equipment.
Jingjing Wang, Hui Yin
doaj   +3 more sources

Vibration signal acquisition and computer simulation detection of mechanical equipment failure

open access: yesNonlinear Engineering, 2022
The author in order to solve the problem of optimizing the accuracy of mechanical equipment failure detection proposes a vibration signal collection and computer simulation detection for mechanical equipment failure. Using wavelet domain Wiener filtering-
Yonggang Wang   +3 more
semanticscholar   +1 more source

Predicting Equipment Failure in Manufacturing Plants: An AI-driven Maintenance Strategy

open access: yesMathematical Statistician and Engineering Applications, 2021
Failure of equipment can lead to costly repairs and downtime for manufacturing facilities. Traditional maintenance techniques can result in unexpected failures, which can cause revenue losses and production delays.
Bijesh Dhyani
semanticscholar   +1 more source

Percutaneous retrieval of intracardiac fragmented hemodialysis catheter using a snare-loop catheter: A case report

open access: yesJKKI (Jurnal Kedokteran dan Kesehatan Indonesia), 2020
We presented a 60-year-old woman with an history of end-stage renal disease on regular hemodialysis, twice a week, came with a tunneled dialysis catheter (TDC) that was attached to the right internal jugular vein.
Adhitya Ginting   +2 more
doaj   +1 more source

Empirical Bayes methodology for estimating equipment failure rates with application to power generation plants [PDF]

open access: yes, 2008
Many reliability databases pool event data for equipment across different plants. Pooling may occur both within and between organizations with the intention of sharing data across common items within similar operating environments to provide better ...
Hutchison, Kenneth   +3 more
core   +1 more source

Failure Detection and Primary Cause Identification of Multivariate Time Series Data in Semiconductor Equipment

open access: yesIEEE Access, 2023
Downtime caused by equipment failure is the biggest productivity problem in the 24-hour a day operations of the semiconductor industry. Although some equipment failures are inevitable, increases in productivity can be gained if the causes of failures can
Minjae Baek, S. Kim
semanticscholar   +1 more source

Critical Incident Analysis: Equip to Avoid Failure [PDF]

open access: yesJournal of Perioperative Practice, 2017
This work is set in the context of perioperative practice in difficult airway management. It integrates a root cause analysis and fish bone technique to investigate a critical incident in temporary yet crucial equipment failure. Risk management and incident reporting is analysed alongside human factors in the operating theatre environment.
Potts, N., Martin, DSE, Hoy, L.
openaire   +3 more sources

Risikomanagement für medizinische Netzwerke in der Intensiv- und Notfallmedizin. Gemeinsames Positionspapier zur Norm IEC 80001-1 [Risk management for medical networks in intensive care and emergency medicine – a joint position paper on IEC 80001-1]

open access: yesGMS Medizinische Informatik, Biometrie und Epidemiologie, 2013
[english] IEC 80001-1 is an international standard and offers recommendations for a risk management process for medical information technology networks (MITs). MITs are defined as IT networks incorporating at least one medical device.
Imhoff, Michael   +6 more
doaj   +1 more source

Optimising Age-Replacement and Extended Non-Renewing Warranty Policies in Lifecycle Costing [PDF]

open access: yes, 2011
This paper analyses the life cycle cost of equipment protected by both base and extended warranty policies from a consumer's perspective. We assume that the equipment has two types of failure: minor and catastrophic. A minor failure can be corrected with
Longhurst, Phil, Wu, Shaomin
core   +2 more sources

A 5-Month-Old Infant with Right Scrotum Swelling

open access: yesArchives of Academic Emergency Medicine, 2014
Case presentation: A five-month-old male infant (gestational age 28 weeks, birthweight 1020 gm) with posthemorrhagic hydrocephalus subsequent to prematurity had a left sided ventriculoperitoneal shunt 3 months after birth.
Shih-Wen Hung   +4 more
doaj   +1 more source

Home - About - Disclaimer - Privacy