Results 11 to 20 of about 1,032,768 (266)

Prediction Interval: What to Expect When You're Expecting … A Replication. [PDF]

open access: yesPLoS ONE, 2016
A challenge when interpreting replications is determining whether the results of a replication "successfully" replicate the original study. Looking for consistency between two studies is challenging because individual studies are susceptible to many ...
Jeffrey R Spence, David J Stanley
doaj   +4 more sources

Finding efficient solutions in the interval multi-objective linear programming models [PDF]

open access: yesYugoslav Journal of Operations Research, 2021
The aim of our paper is to obtain efficient solutions to the interval multi-objective linear programming (IMOLP) models. In this paper, we propose a new method to determine the efficient solutions in the IMOLP models by using the expected value and ...
Batamiz Aida, Allahdadi Mehdi
doaj   +1 more source

Appraisal and simulation of expected genetic gain for production and reproduction traits in Sahiwal cattle

open access: yesIndian Journal of Animal Sciences, 2021
The present study was undertaken with an objective to assess the expected genetic gain for production and reproduction traits, viz. 305-day milk yield (305DMY), average daily milk yield (ADMY), and calving to first insemination interval (CFI) in Sahiwal
POONAM RATWAN   +2 more
doaj   +1 more source

Why the Mw 6 parkfield earthquake expected in the 1985–1993 interval was postponed till 2004?

open access: yesGeomatics, Natural Hazards & Risk, 2022
The earthquake prediction released by USGS in 1985 to the public stated that there was an Mw6.0 earthquake occurring in the Parkfield area by January 1993 with a 95% chance. This prediction has proved unsuccessful.
Xuezhong Chen, Yane Li, Lijuan Chen
doaj   +1 more source

Fuzzy Evaluation Model of Machining Process Loss

open access: yesMathematics, 2023
In facing the many negative impacts of global warming on the earth’s environment, the machining industry must reduce the rates of product rework and scrap in the manufacturing process by enhancing the process quality of the processed product.
Kuen-Suan Chen   +4 more
doaj   +1 more source

Estimating average wind speed in Thailand using confidence intervals for common mean of several Weibull distributions [PDF]

open access: yesPeerJ, 2023
The Weibull distribution has been used to analyze data from many fields, including engineering, survival and lifetime analysis, and weather forecasting, particularly wind speed data.
Manussaya La-ongkaew   +2 more
doaj   +2 more sources

Modified Clopper-Pearson Confidence Interval for Binomial Proportion [PDF]

open access: yesJournal of Statistical Theory and Applications (JSTA), 2014
We introduce expected coverage probability as a measure for constructing confidence intervals for the binomial proportion, p. We propose a model based confidence interval for p using the expected coverage probabilities of the Clopper-Pearson interval ...
Desale Habtzghi   +2 more
doaj   +1 more source

Passenger Flows at Escalators – Arriving at Count Interval for Design Flow Estimation

open access: yesEuropean Journal of Transport and Infrastructure Research, 2021
Selection of a count interval to extract flow data on pedestrian facilities seems to be governed by the operational environment of the facility and context of the study.
Dharitri Kahali, Rajat Rastogi
doaj   +1 more source

Interval Optimization In Portfolio Selection with Conditional Value At Risk [PDF]

open access: yesتحقیقات مالی, 2017
In this paper portfolio selection problem with interval optimization approach is surveyed. CVaR is risk measure. CVaR is the expected loss depending on the chosen confidence level.
Amir Abbas Najafi   +2 more
doaj   +1 more source

A Mathematical Model and Two Fuzzy Approaches Based on Credibility and Expected Interval for Project Cost-Quality-Risk Trade-Off Problem in Time-Constrained Conditions

open access: yesAlgorithms, 2022
To successfully finalize projects and attain their determined purposes, it is indispensable to control all success criteria of a project. The time–cost trade-off (TCT) is known as a prevalent and efficient approach applied when the planned finish date of
Mohammad Hossein Haghighi   +1 more
doaj   +1 more source

Home - About - Disclaimer - Privacy