Results 31 to 40 of about 710,173 (345)

Analysis of factors affecting the construction duration of public health emergency medical facilities

open access: yesFrontiers in Public Health, 2023
ObjectivesThis study explores the factors influencing the construction duration of public health emergency medical facilities and the ways in which they can be enhanced.MethodsCombining 30 relevant emergency medical facility construction cases in ...
Wenchao Zhao, Haibo He
doaj   +1 more source

Flexible Designing of Large Sports Complex

open access: yesArchives of Civil Engineering, 2016
The article presents the ideas of flexible design in the construction sector. Flexibility in the construction sector was discussed and defined between typical and flexible approaches to design.
Kośmieja M., Pasławski J.
doaj   +1 more source

The impact of a health facility construction campaign on health service utilisation and outcomes: analysis of spatially linked survey and facility location data in Ethiopia

open access: yesBMJ Global Health, 2020
Background Access to health facilities in many low-income and middle-income countries remains low, with a strong association between individuals’ distance to facilities and health outcomes.
Kevin Croke   +3 more
doaj   +1 more source

Facility design, construction, and operation [PDF]

open access: yes, 1995
France has been disposing of low-level radioactive waste (LLW) at the Centre de Stockage de la Manche (CSM) since 1969 and now at the Centre de Stockage de l`Aube (CSA) since 1992. In France, several agencies and companies are involved in the development and implementation of LLW technology. The Commissariat a l`Energie Atomic (CEA), is responsible for
openaire   +2 more sources

Russia’s Legal Regulation and Experience in the Field of BIM Implementation at Different Stages of the Construction Facility Life Cycle

open access: yesModern Trends in Construction, Urban and Territorial Planning, 2023
Introduction. The article focuses on the problems and prospects of building information modelling (BIM) technologies development in the construction industry of the country, valid development strategies, BIM technologies implementation and influence in ...
S. Sheina, S. L. Shuykov
semanticscholar   +1 more source

The High Brilliance neutron Source (HBS): A project for a next generation neutron research facility [PDF]

open access: yesEPJ Web of Conferences, 2023
The High Brilliance neutron Source (HBS) is a project for a next generation neutron research facility, based on new concepts and recent technological advancements.
Brückel Thomas   +28 more
doaj   +1 more source

Case Study on the Remodeling of Laboratory Medicine according to International Instructions: Focus on the Case of S Hospital

open access: yesKorean Journal of Clinical Laboratory Science
This paper reports a case study of the remodeling of the Department of Diagnostic Medicine at S hospital, conducted according to international guidelines.
Taewon JUNG   +3 more
doaj   +1 more source

Research and Design on Intensive Power Exchange Facility of Electric Vehicles

open access: yes发电技术, 2019
In order to solve the problems of electric vehicles power exchange station such as long construction period, low-efficiency and potential safety hazard etc., this paper proposed a design mentality and scheme of intensive power exchange facility.
Yanping JIANG, Peijun CHEN, Haiyan CHEN
doaj   +1 more source

Superconducting magnet system for an experimental disk MHD facility [PDF]

open access: yes, 1991
A predesign of a split-pair magnet for a magnetohydrodynamic (MHD) facility for testing a 10-MW open-cycle disk or a 5-MW closed-cycle disk generator is presented.
Kate, H.H.J. ten   +2 more
core   +2 more sources

Status of NICA

open access: yesEPJ Web of Conferences, 2018
The NICA (Nuclotron-based Ion Collider fAcility) is the new international research facility under construction at the Joint Institute for Nuclear Research (JINR) in Dubna.
Kekelidze Vladimir   +6 more
doaj   +1 more source

Home - About - Disclaimer - Privacy