Results 51 to 60 of about 468,839 (205)

Scheduling of non-repetitive lean manufacturing systems under uncertainty using intelligent agent simulation [PDF]

open access: yes, 2008
World-class manufacturing paradigms emerge from specific types of manufacturing systems with which they remain associated until they are obsolete. Since its introduction the lean paradigm is almost exclusively implemented in repetitive manufacturing ...
Mousavi, A, Papadopoulou, T C
core   +1 more source

The Flow Shop problem with a server(带服务器的Flow Shop问题)

open access: yesZhejiang Daxue xuebao. Lixue ban, 2000
经典的Flow Shop问题是排序理论中一个得到广泛研究的问题。本文研究的是带服务器的Flow Shop问题。证明了F2,S∥Cmax是强NP-C的,并构造了一个渐近比为2的近似算法。此外,还讨论了它的两种多项式可解的条件。
SUChun-jie(苏纯洁)   +1 more
doaj   +1 more source

An application of effective genetic algorithms for Solving Hybrid Flow Shop Scheduling Problems [PDF]

open access: yesInternational Journal of Computational Intelligence Systems, 2008
This paper addresses the Hybrid Flow Shop (HFS) scheduling problems to minimize the makespan value. In recent years, much attention is given to heuristic and search techniques.
Cengiz Kahraman   +3 more
doaj   +1 more source

Iterated-greedy-based algorithms with beam search initialization for the permutation flowshop to minimize total tardiness [PDF]

open access: yes, 2018
The permutation flow shop scheduling problem is one of the most studied operations research related problems. Literally, hundreds of exact and approximate algorithms have been proposed to optimise several objective functions. In this paper we address the
Fernández-Viagas Escudero, Víctor   +2 more
core   +1 more source

Flow shop scheduling decisions through Techniques for Order Preference by Similarity to an Ideal Solution (TOPSIS)

open access: yesInternational Journal of Production Management and Engineering, 2016
The flow-shop scheduling problem (FSP) has been widely studied in the literature and having a very active research area. Over the last few decades, a number of heuristic/meta-heuristic solution techniques have been developed.
Arun Gupta, Shailendra Kumar
doaj   +1 more source

Multiprocessor task scheduling in multistage hyrid flowshops: a genetic algorithm approach [PDF]

open access: yes, 2004
This paper considers multiprocessor task scheduling in a multistage hybrid flow-shop environment. The objective is to minimize the make-span, that is, the completion time of all the tasks in the last stage.
Davis L   +6 more
core   +1 more source

Algoritma ant-lion optimizer untuk meminimasi emisi karbon pada penjadwalan flow shop dependent sequence set-up

open access: yesJLI: Jurnal Litbang Industri, 2019
Industri manufaktur akhir-akhir ini dituntut untuk memperhatikan isu lingkungan. Pemakaian energi pada produksi umumnya menghasilkan emisi karbon. Emisi karbon ini menjadi permasalahan di lingkungan.
Dana Marsetiya Utama   +4 more
doaj   +1 more source

Constraint programing for solving four complex flexible shop scheduling problems

open access: yesIET Collaborative Intelligent Manufacturing, 2021
In recent years, with the advent of robust solvers such as Cplex and Gurobi, constraint programing (CP) has been widely applied to a variety of scheduling problems.
Leilei Meng   +7 more
doaj   +1 more source

Calibratin of Jaguar Aircraft structure retering rig [PDF]

open access: yes, 1989
This document descries the - cali brati'on tests carried out on the fuel flow metering 4• used in fuelling and de-fuelling of. the Jaguar aircraft/Structures 'shop of HAL, Bangalore . The-results of the calibration tests are tabulated and are also shown
Chidananda, MS, Venkatesh, S
core  

PENJADWALAN FLOWSHOP MENGGUNAKAN ALGORITMA NAWAZ ENSCORE HAM

open access: yesJurnal Ilmiah Teknik Industri, 2014
This article attempts to schedule flow shop production using Nawaz Enscore Ham (NEH) to schedule jobs machining. The objective of this paper is to minimize total makespan which could reduce total production costs.
Ilyas Masudin   +2 more
doaj   +1 more source

Home - About - Disclaimer - Privacy