Results 201 to 210 of about 852,733 (217)
Some of the next articles are maybe not open access.
Selecting jobs for a heavily loaded shop with lateness penalties
Computers and Operations Research, 1996zbMATH Open Web Interface contents unavailable due to conflicting licenses.
Thomas Ernest Morton, Susan A Slotnick
exaly +4 more sources
Cost reduction effects of in-situ PC production for heavily loaded long-span buildings
Journal of Asian Architecture and Building Engineering, 2020Jeeyoung Lim, Seunghyun Son, Sunkuk Kim
exaly
Heavily loaded line EHL contacts with thin adsorbed soft layers
Mathematics and Mechanics of Solids, 2020Andrey S Vasiliev +2 more
exaly
Proceedings of the Institution of Mechanical Engineers, Part C: Journal of Mechanical Engineering Science, 2019
Zhihao Liu
exaly
Zhihao Liu
exaly
Proportionate flow-shop scheduling with rejection
Journal of the Operational Research Society, 2016Daniel Oron, Dvir Shabtay
exaly
Bonding and Structure of Heavily .pi.-Loaded Complexes
Inorganic Chemistry, 1995Thomas R. Cundari +2 more
exaly

