Results 131 to 140 of about 169 (168)
Some of the next articles are maybe not open access.
1996
Once the management requirements planning (MRP) system has projected a plan, the remaining task is to execute the plan. Through proper consideration of capacity, the evolving plan may be doable, but “doing it”—the execution— can be most challenging, especially in a job-shop environment. MRP was developed as a tool to assist in the complicated dependent
openaire +1 more source
Once the management requirements planning (MRP) system has projected a plan, the remaining task is to execute the plan. Through proper consideration of capacity, the evolving plan may be doable, but “doing it”—the execution— can be most challenging, especially in a job-shop environment. MRP was developed as a tool to assist in the complicated dependent
openaire +1 more source
Adaptive Scheduling for Assembly Job Shop With Uncertain Assembly Times Based on Dual Q-Learning
International Journal of Production Research, 2021Bhaba R. Sarker
exaly

