Results 261 to 270 of about 13,809 (278)
Some of the next articles are maybe not open access.

New hard benchmark for flowshop scheduling problems minimising makespan

European Journal of Operational Research, 2015
Eva Vallada   +2 more
exaly  

A GA-based NN approach for makespan estimation

Applied Mathematics and Computation, 2007
Shujuan Li
exaly  

A note on a greedy heuristic for flow-shop makespan minimization with no machine idle-time

European Journal of Operational Research, 2008
Gur Mosheiov
exaly  

Heuristic for no-wait flow shops with makespan minimization

International Journal of Production Research, 2008
Xiaoping Li, Cheng Wu
exaly  

Heuristic procedures for minimizing makespan and the number of required pallets

European Journal of Operational Research, 1995
Chengbin Chu, Jean-Marie Proth
exaly  

No-wait flowshop scheduling problem with two criteria; total tardiness and makespan

European Journal of Operational Research, 2018
Ali Allahverdi   +2 more
exaly  

Scheduling on a two-machine flowshop subject to random breakdowns with a makespan objective function

European Journal of Operational Research, 1995
Ali Allahverdi, John Mittenthal
exaly  

Heuristics for the two-machine flowshop scheduling problem to minimise makespan with bounded processing times

International Journal of Production Research, 2010
Ali Allahverdi, Harun Aydilek
exaly  

Parallel-machine scheduling to minimize makespan with fuzzy processing times and learning effects

Information Sciences, 2014
Wei-Chang Yeh   +2 more
exaly  

Home - About - Disclaimer - Privacy