Results 271 to 278 of about 13,809 (278)
Some of the next articles are maybe not open access.

A heuristic for scheduling a permutation flowshop with makespan objective subject to maximum tardiness

International Journal of Production Economics, 2006
JOSÉ M Framinan, Rainer Leisten
exaly  

Makespan minimization for two uniform parallel machines

International Journal of Production Economics, 2003
Ching-Jong Liao
exaly  

Sequencing with uncertain numerical data for makespan minimisation

Journal of the Operational Research Society, 1999
exaly  

Order acceptance and scheduling with weighted makespan

4OR
Lingfa Lu   +3 more
openaire   +1 more source

No-wait flowshops with bicriteria of makespan and total completion time

Journal of the Operational Research Society, 2002
exaly  

Home - About - Disclaimer - Privacy