Results 81 to 90 of about 5,797,236 (186)

Expert System-Based Exploratory Approach to Cost Modeling of Reinforced Concrete Office Building [PDF]

open access: yes, 2013
Expert system is a conventional method that is in use in cost modeling, considering its advantage over traditional regression method. It is based on this fact, that this study aimed at deploying neural network in cost modeling of reinforced concrete ...
Amusan, L. M.   +4 more
core  

Housing in the macroeconomy [PDF]

open access: yes
Presentation to the Office of Federal Housing Enterprise Oversight Symposium, Ronald Reagan Building and International Trade Center, Washington, DC, March 10 ...
William Poole
core   +3 more sources

Office building boom and bust [PDF]

open access: yes
Office buildings ; Real property ; Property ...
Randall J. Pozdena
core  

Sweet Home Chicago: The Story of an Affordable Housing Campaign [PDF]

open access: yes, 2012
The Sweet Home Chicago (SHC) Coalition was comprised of nine community organizations and two labor unions that conducted a two and a half year campaign that resulted in passage of the Vacant Building TIF Purchase Rehab Program on May 4, 2011.
Jim Field, Julie Dworkin
core  

Het kantoorgebouw van het electriciteitsgebouw te Rotterdam

open access: yesBulletin KNOB, 1990
The office building of the Municipal Electricity Service at Rotterdam is the first concrete working-out of the Dutch striving after multi-storey buildings and framed constructions in particular.
P. Kalsbeek
doaj   +1 more source

Exploration of the Energy Efficiency of the Greater London Authority Building (GLA Building/City Hall)

open access: yesJournal of Applied Sciences and Environmental Management, 2010
This research paper set out to explore the following research question: “what shape and form should a building be in order to achieve energy efficiency in the design and construction of the tall office building?” This involved the exploratory case study ...
EE Osaji, J Hudson, P Chynoweth
doaj   +1 more source

Office building occupancy monitoring through image recognition sensors

open access: yesInternational Journal of Safety and Security Engineering, 2019
In the Architecture, Engineering, construction and Operations (AEcO) there is a growing interest in the use of the Building Information modelling (BIm). Through integration of information and processes in a digital model, BIm can optimise resources along
Mannino Antonino   +4 more
semanticscholar   +1 more source

A solar heated office building [PDF]

open access: yes, 1953
Thesis (B. Arch.)--Massachusetts Institute of Technology, Dept. of Architecture, 1953.MIT copy bound with: An apartment house for Greenwich Village, New York City / Anthony de Alteriis [1953] Accompanying drawings held by MIT Museum.Includes ...
Hampshire, John Ben
core  

Regulations and robust low-carbon buildings [PDF]

open access: yes, 2009
Building regulations and associated calculation methods have been rapidly evolving, driven in Europe by the European Union Energy Performance of Buildings Directive. As an example, the current UK regulations are explored in relation to buildings that are
Tuohy, Paul
core   +1 more source

Office building Slezská [PDF]

open access: yes, 2016
Import 02/11/2016Pitra, L.: Administrativní budova Slezská – Slezská Ostrava. Bakalářská práce. Ostrava: VŠB – Technická univerzita Ostrava, Fakulta stavební, Katedra architektury, 2016, s.45, Vedoucí práce: Ing. arch.
Pitra, Lukáš
core  

Home - About - Disclaimer - Privacy