Results 21 to 30 of about 1,738,675 (258)
We consider tasks scheduling problem on identical parallel machines by the criterion of minimizing the total weighted tardiness of tasks. All tasks arrive for processing at the same time.
Alexander Anatolievich Pavlov +2 more
doaj +1 more source
This paper considers the problem of scheduling a set of jobs on unrelated parallel machines subject to several constraints which are non-zero arbitrary release dates, limited additional resources, and non-anticipatory sequence-dependent setup times.
Ibrahim M. Al-harkan, Ammar A. Qamhan
doaj +1 more source
Coordinated Production and Delivery Operations With Parallel Machines and Multiple Vehicles
This paper investigated a coordinated optimization problem of production and delivery operations with parallel machines and multiple vehicles so that a more cost-effective and sustainable supply chain performance can be achieved.
Dunhu Liu +3 more
doaj +1 more source
This paper examines the uniform parallel-machine scheduling problem in which the objective aims to minimize the total resource consumption (TRC) with a bounded makespan. A matheuristic is proposed to deal with this strongly NP-hard problem.
Shih-Wei Lin, Kuo-Ching Ying
doaj +1 more source
In this study, the objective of minimizing makespan has been considered for a scheduling problem of identical parallel machines with a single server and unavailability constraints.
Lotfi Hidri +3 more
doaj +1 more source
This article proposes two types of lockable spherical joints which can perform three different motion patters by locking or unlocking corresponding rotational axes.
Teng-fei Tang, Jun Zhang
doaj +1 more source
In this paper, we focus on solving the vector scheduling problem with submodular penalties on parallel machines. We are given n jobs and m parallel machines, where each job is associated with a d-dimensional vector.
Bihui Cheng, Wencheng Wang
doaj +1 more source
Resource constraint scheduling on two dedicated machines: Application to avionics
In civil aircraft, two partially redundant hydraulic circuits typically power various systems. During assembly, a critical phase involves simultaneously rinsing and purging these hydraulic circuits using loops.
Ouissem Mesli-Kesraoui +6 more
doaj +1 more source
Design of Processor Array Based on an Optimized Multiprojection Approach
Parallelization methodologies allow to automate the process of designing optimal processor arrays based on mathematical representations of the algorithm to be implemented.
CAMPOS, J.-M, CUMPLIDO, R.
doaj +1 more source
IDENTICAL PARALLEL MACHINES SCHEDULING USING GENETIC ALGORITHM
Minimizing the scheduling production time consider one of the most important factors for companies which their objectives is achieve the maximum profits.
Aseel J Haleel
doaj +1 more source

