Results 221 to 230 of about 13,164 (284)

Synthetic α-synuclein fibrils replicate in mice causing MSA-like pathology. [PDF]

open access: yesNature
Burger D   +24 more
europepmc   +1 more source

Testing of Phasor Measurement Units

2010 63rd Annual Conference for Protective Relay Engineers, 2009
Phasor Measurement Units (PMUs) are getting increasingly popular. Major incidents in the near past, such as the big blackouts in 2003 in the northeast of the USA and in Italy, have raised the interest in all means that support the observation of the condition of the electrical power network, assessing system stability, and predicting problems. PMUs are
F. Steinhauser   +2 more
openaire   +1 more source

Testing phasor measurement units

IET 9th International Conference on Developments in Power Systems Protection (DPSP 2008), 2008
Phasor measurement units (PMUs) are getting increasingly popular. Major incidents in the near past, such as the big blackouts in 2003 in the northeast of the USA and in Italy, have raised the interest in all means that support the observation of the condition of the electrical power network, assessing system stability, and predicting problems. PMUs are
F. Steinhauser, T. Schossig
openaire   +1 more source

Phasor measurement unit placement Algorithm

2009 IEEE Power & Energy Society General Meeting, 2009
The importance of having phasor measurement units or PMUs in an electric grid is widely recognized. However, the number of PMUs on a large system is limited by cost and the placement of PMUs must be addressed. The main objective of this research is to create an algorithm to identify buses that are the best candidates for PMU placement based on certain ...
S. Kulkarni   +3 more
openaire   +1 more source

The pulse coupled phasor measurement units

2014 IEEE International Conference on Smart Grid Communications (SmartGridComm), 2014
We propose a cross-layer sensor network architecture to convert measurements acquired by a population of sampling devices, into synchronous sensor array measurements, using a network synchronization protocol that is inspired by the dynamics of pulse coupled oscillators (PCO).
Lorenzo Ferrari   +3 more
openaire   +1 more source

PMUs [phasor measurement unit]

IEEE Potentials, 1994
In the spring of 1993, a major new 500 kV transmission line was put in service in Northern California. Test engineers initiated a series of artificial short-circuit faults to test the line installation. As an experiment, the steady-state and transient responses of the power system were recorded.
openaire   +1 more source

Home - About - Disclaimer - Privacy