Results 201 to 210 of about 210,709 (241)
Continuous Glucose Monitoring Intervention for Hispanic Adults With Type 1 Diabetes Receiving Care in a Federally Qualified Health Center: Protocol for a Mixed Methods, Pragmatic Pilot Randomized Controlled Trial. [PDF]
Newlin-Lew K +7 more
europepmc +1 more source
Peppering Injection for Plantar Heel Pain: A Double-Blind Randomized Feasibility Study (a Short Report). [PDF]
Jones MA +5 more
europepmc +1 more source
Some of the next articles are maybe not open access.
Related searches:
Related searches:
Journal of Earthquake Engineering, 2023
Earthquakes have caused catastrophic results in cities since the beginning of settled life, and the cumulative experience of these events has indicated that the lack of seismic resilience brings enormous economic losses and threatens human life. Consequently, the importance of seismic risk mitigation of earthquake-prone structures has arisen to reduce ...
Aydoğdu, Hasan Hüseyin +4 more
openaire +2 more sources
Earthquakes have caused catastrophic results in cities since the beginning of settled life, and the cumulative experience of these events has indicated that the lack of seismic resilience brings enormous economic losses and threatens human life. Consequently, the importance of seismic risk mitigation of earthquake-prone structures has arisen to reduce ...
Aydoğdu, Hasan Hüseyin +4 more
openaire +2 more sources
U.S. Inhibitor Pilot Project: Participant Characteristics and Infusion Log Adherence.
Blood, 2007Abstract Inhibitors are now considered to be the most important complication of clotting factor replacement therapy in hemophilia. In January 2005, the Universal Data Collection (UDC) project, which includes data on over 14,000 patients with hemophilia A or B, was amended to include prospective data collection on inhibitors.
Melissa S. Creary +13 more
openaire +1 more source
Study on voltage and reactive power characteristic and control strategy of UHV AC Pilot Project
2010 International Conference on Power System Technology, 2010In order to ensure that UHV AC Pilot Project can go into operation successfully and operate safely, the voltage and reactive power characteristic of UHV AC pilot project has been analyzed in this paper. Then it has been studied, that the cooperation of voltage and reactive power together with concrete scheme and the principle of operation and control ...
Jian Zhang +3 more
openaire +1 more source

