Results 11 to 20 of about 50 (48)
Some of the next articles are maybe not open access.

Recent advancements on power system restoration

2017 IEEE Innovative Smart Grid Technologies - Asia (ISGT-Asia), 2017
Traditional and current restoration strategies use top- down approach that rely on the use of centralised conventional generation such as hydropower plants and gas power plants to start up the network after a wide area blackout. Analysis of restoration steps is also based on AC networks with no involvement of DC schemes.
Duncan Kaniaru Maina   +1 more
openaire   +2 more sources

Policies for Restoration of a Power System

IEEE Power Engineering Review, 1987
Policies for effective restoration of a power system are presented. Three plans implement these ideas, covering conditioning, preparedness, and restoration. The problem is tackled with a triple approach, from the viewpoint of installations, personnel, and the restoration plan.
J. Gutierrez, M. Staropolsky, A. Garcia
openaire   +1 more source

Power system restoration issues

IEEE Computer Applications in Power, 1991
Some of the problems encountered in the three phases of power system restoration (PSR) are described. The three phases are planning for restart and reintegration of the bulk power supply, actions during system degradations for saving and retaining critical sources of power, and restoration when the power system has stabilized at some degraded level ...
M.M. Adibi, R.J. Kafka
openaire   +1 more source

Simulated power system restoration

2008 43rd International Universities Power Engineering Conference, 2008
Outage time after extensive blackouts depends very much on the power system restoration process. Power system restoration is a very challenging task to the operator since the situation is so far from normal conditions. This paper proposes a simulation-based tool that determines a feasible sequence of operator actions that restores power system ...
Olof Samuelsson   +2 more
openaire   +1 more source

Joint Assessment and Restoration of Power Systems

2012
This paper studies the joint damage assessment and recovery of the power infrastructure after a natural disaster has occurred. Earlier work in this area proposed an optimization algorithm for the recovery phase, assuming that the infrastructure damage was known precisely. This paper lifts this assumption which does not always hold in practice.
Pascal Van Hentenryck   +2 more
openaire   +2 more sources

Power system restoration planning

IEEE Transactions on Power Systems, 1994
Power system restoration, as an extraordinary mode of system operation, requires careful planning and operator training. The generic tasks of restoration include determination of system and equipment status, preparation of plants and network for systematic restoration, reenergization of the network, and system rebuilding.
M.M. Adibi, L.H. Fink
openaire   +1 more source

Power System Restoration in Restructured Power Industry

2007 IEEE Power Engineering Society General Meeting, 2007
Power system restoration decision-making is one of the most important and indispensable issues for ensuring fast power supply restoration to end users. In recent years, the power industry around the globe has been undertaking an in-depth restructuring, and this has led to some new challenges to the problem of power system restoration.
Zhenzhi Lin, Fushuan Wen
openaire   +1 more source

Use of HVDC links for power system restoration

Electric Power Systems Research, 2009
Power system restoration plans worldwide have often been based on black start units capable of supplying cranking power to bulk generation plants. The increase in the number and size of CCGT plants and other forms of generation with low regulating capacity and requiring a restless growing power for the cranking phase needs that new strategies and tools
BARSALI, STEFANO, SALVATI R, ZAOTTINI R.
openaire   +2 more sources

An Integrated Approach for Power System Restoration Planning

Proceedings of the IEEE, 2017
Power system outages/blackouts, especially weather related, are becoming more and more frequent, incurring significant economic and social costs. The ability to restore power services quickly after a blackout is crucial for power system resilience.
Feng Qiu, Peijie Li
openaire   +2 more sources

Power System Restoration - A Task Force Report

IEEE Transactions on Power Systems, 1987
The IEEE PES System Operation Subcommittee has established the Power System Restoration Task Force to: review operating practices, conduct a literature search, prepare relevant glossaries and bibliographies, and promote information exchange through technical papers. This is the first report of the Task Force.
M. Adibi   +7 more
openaire   +1 more source

Home - About - Disclaimer - Privacy