Results 181 to 190 of about 211,981 (215)
Some of the next articles are maybe not open access.
Strand bond stress–slip relationship for prestressed concrete members at prestress release
Materials and Structures, 2015The transfer of prestress force from prestressing strands to the surrounding concrete is dependent on the bond between the two materials. Understanding the actual bond stress distribution along the transfer length results in optimized design of the transfer zone of prestressed concrete members.
Yaohua Deng +2 more
openaire +1 more source
Bond of prestressing strand to concrete
PCI Journal, 2021Andrew Osborn, Mike Lanier, Neil Hawkins
openaire +1 more source
Response of corroded prestressed beams with bonded strands
Proceedings of the Institution of Civil Engineers - Structures and Buildings, 2012Deterioration of post-tensioned structures may take place as a consequence of severe environmental conditions or design or construction errors. This paper investigates analytically the effects of corrosion on the structural response of bonded post-tensioned beams.
Castel, Arnaud +2 more
openaire +2 more sources
Reduced Strand Spacing in Pretensioned, Prestressed Members
ACI Structural Journal, 1994Pretensioned, prestressed concrete girders are used widely in bridge superstructures in the United States. Predominantly, 0.5-in. (12.7-mm)-diameter prestressing strand is used in these girders at a center-to-center spacing of 2 in. (50.8 mm). This corresponds to the four-strand-diameter center-to-center spacing, which is the American Concrete ...
openaire +1 more source
Fatigue Properties of Prestressing Strand
PCI Journal, 1966R. F. Warner, C. L. Hulsbos
openaire +1 more source
Development Length of Epoxy-Coated Prestressing Strand
ACI Materials Journal, 1990To provide corrosion protection in adverse environments, a 7-wire prestressing strand is coated with a grit-impregnated epoxy. The effect of the epoxy coating and grit on development length for 3 different sizes of prestressing strand was investigated. The development lengths of 3 different densities of grit were studied as well.
openaire +1 more source
Probabilistic Models for Fatigue Resistance of Seven-Wire Prestressing Strands and Stay Cables
Journal of Bridge Engineering, 2021Habib Tabatabai +2 more
exaly
Top Strand Effect and Evaluation of Effective Prestress in Prestressed Concrete Beams
2014Master of ...
openaire +1 more source

