Multiple relaxations in temporal planning [PDF]

open access: yes, 2004
CRIKEY is a planner that separates out the scheduling from the classical parts of temporal planning. This can be seen as a relaxation of the temporal information during the classical planning phase.
Fox, M., Halsey, K., Long, D.
core  

Transferrin receptor 1‐mediated iron uptake supports thermogenic activation in human cervical‐derived adipocytes

open access: yesFEBS Letters, EarlyView.
In this study, we found that human cervical‐derived adipocytes maintain intracellular iron level by regulating the expression of iron transport‐related proteins during adrenergic stimulation. Melanotransferrin is predicted to interact with transferrin receptor 1 based on in silico analysis.
Rahaf Alrifai   +9 more
wiley   +1 more source

Analisis Penjadwalan Produksi Dengan Metode Campbell Dudek Smith (CDS), PT. ISM TBK. Divisi Bogasari Flour Mills Jakarta

open access: yesOPSI, 2020
Bogasari is one of the largest wheat flour companies in Indonesia, besides wheat flour also produces a byproduct namely pasta, pellet, and livestock food.
Purwati Purwati, Santika Sari
doaj   +1 more source

Strategic marketing, production, and distribution planning of an integrated manufacturing system [PDF]

open access: yes
Production Scheduling;Distribution;CIM ...
Ashayeri, J.   +2 more
core   +1 more source

Tau acetylation at K331 has limited impact on tau pathology in vivo

open access: yesFEBS Letters, EarlyView.
We mapped tau post‐translational modifications in humanized MAPT knock‐in mice and in amyloid‐bearing double knock‐in mice. Acetylation within the repeat domain, particularly around K331, showed modest increases under amyloid pathology. To test functional relevance, we generated MAPTK331Q knock‐in mice.
Shoko Hashimoto   +3 more
wiley   +1 more source

Integrating Preventive Maintenance Scheduling As Probability Machine Failure And Batch Production Scheduling

open access: yesComTech, 2016
This paper discusses integrated model of batch production scheduling and machine maintenance scheduling. Batch production scheduling uses minimize total actual flow time criteria and machine maintenance scheduling uses the probability of machine failure
Zahedi Zahedi, Ashadi Salim
doaj   +1 more source

Scheduling with Fuzzy Methods

open access: yes, 2004
Nowadays, manufacturing industries -- driven by fierce competition and rising customer requirements -- are forced to produce a broader range of individual products of rising quality at the same (or preferably lower) cost. Meeting these demands implies an
Eiden, Wolfgang Anthony
core   +1 more source

Structural insights into an engineered feruloyl esterase with improved MHET degrading properties

open access: yesFEBS Letters, EarlyView.
A feruloyl esterase was engineered to mimic key features of MHETase, enhancing the degradation of PET oligomers. Structural and computational analysis reveal how a point mutation stabilizes the active site and reshapes the binding cleft, expading substrate scope.
Panagiota Karampa   +5 more
wiley   +1 more source

On Idle Energy Consumption Minimization in Production: Industrial Example and Mathematical Model

open access: yes, 2020
This paper, inspired by a real production process of steel hardening, investigates a scheduling problem to minimize the idle energy consumption of machines.
Benedikt, Ondřej   +2 more
core   +1 more source

Joint scheduling of jobs and preventive maintenance operations in the flowshop sequencing problem: A resolution with sequential and integrated strategies. [PDF]

open access: yes, 2011
International audienceUsually, scheduling of maintenance operations and production sequencing are dealt with separately in the literature and, therefore, also in the industry.
Ali Guebli, Sid   +4 more
core   +3 more sources