Results 11 to 20 of about 198,428 (256)

Cost Optimal Project Scheduling

open access: yesOrganizacija, 2008
Cost Optimal Project Scheduling This paper presents the cost optimal project scheduling. The optimization was performed by the nonlinear programming approach, NLP. The nonlinear total project cost objective function is subjected to the rigorous system of the activity precedence relationship constraints, the activity duration constraints ...
Klanšek, Uroš, Pšunder, Mirko
openaire   +2 more sources

Discussion with the paper 'Project costs planning in the conditions of uncertainty' by H. Štiková

open access: yesAgricultural Economics (AGRICECON), 2014
In the paper, there is analysed one particular approach to the modelling uncertainty in the project management through an original version of the fuzzy CPM (Critical Path Method).
Igor KREJČÍ, Milan HOUŠKA
doaj   +1 more source

Schedule quality evaluation for Construction Project Management

open access: yesTechne, 2020
The construction schedule is the most important construction document as it indicates total project duration, project stages and times of activities, costs, logical sequences, quality and safety.
Marco Alvise Bragadin, Kalle Kahkonen
doaj   +1 more source

Estimating the Probability Distribution of Construction Project Completion Times Based on Drum-Buffer-Rope Theory

open access: yesApplied Sciences, 2021
Various factors affecting the construction progress are regarded as bottlenecks giving rise to the project duration overrun. The contractor should combine the project schedule with the plan in order to reduce the uncertainty of the project activities ...
Xun Liu, Le Shen, Kun Zhang
doaj   +1 more source

Integrated multi-resource planning and scheduling in engineering project [PDF]

open access: yesJournal of Project Management, 2017
Planning and scheduling processes in project management are carried out sequentially in prac-tice, i.e. planning project activities first without visibility of resource limitation, and then schedul-ing the project according to these pre-planned ...
Samer Ben Issa, Yiliu Tu
doaj   +1 more source

Work breakdown structure application for man-hours calculation in hull construction shipbuilding in Malaysia

open access: yesCogent Engineering, 2019
In Malaysia, the majority of oil & gas platform construction use fixed type substructure such as jacket type platform. To date, only one Semi-FPS has been constructed in Malaysia involving complex and challenging issues in the construction of hull ...
W. A. Z. Wan Abd Rahman   +2 more
doaj   +1 more source

Developing BIM-assisted as-built schedule management system for general contractors

open access: yesJournal of Civil Engineering and Management, 2014
Construction project control attempts to obtain real-time as-built schedule information and to eliminate project delays by effectively enhancing dynamic schedule control and management.
Hui-Ping Tserng   +2 more
doaj   +1 more source

Practical crash duration estimation for project schedule activities

open access: yesJournal of King Saud University: Engineering Sciences, 2021
The increasing demand in project acceleration in the construction industry has led to the development of a practical crash duration estimation model for activities.
Fachrurrazi, Saiful Husin
doaj   +1 more source

Stochastic Earned Duration Analysis for Project Schedule Management

open access: yesEngineering, 2022
Earned duration management (EDM) is a methodology for project schedule management (PSM) that can be considered an alternative to earned value management (EVM).
Fernando Acebes   +3 more
doaj   +1 more source

An integrated framework using Augmented Reality (AR) and Building Information Modeling (BIM) for enhancing the stakeholders' interaction in 4d modeling of linear projects [PDF]

open access: yesمهندسی عمران شریف, 2022
The project schedule is a critical factor in project success in the Architecture, Engineering, and Construction (AEC) industry. An efficient schedule can develop a shared vision (i.e., understanding) among project stakeholders.
Kh, Ghorab, H. Taghaddos
doaj   +1 more source

Home - About - Disclaimer - Privacy