Integration of Cost andWork Breakdown Structures in the Management of Construction Projects [PDF]

open access: yes, 2020
Scope management allows project managers to react when a project underperforms regarding schedule, budget, and/or quality at the execution stage. Scope management can also minimize project changes and budget omissions, as well as improve the accuracy of ...
Anticona   +53 more
core   +2 more sources

Practical crash duration estimation for project schedule activities

open access: yesJournal of King Saud University: Engineering Sciences, 2021
The increasing demand in project acceleration in the construction industry has led to the development of a practical crash duration estimation model for activities.
Fachrurrazi, Saiful Husin
doaj   +1 more source

Cost and Time Control Analysis with Earned Value Method in the MRT-Hub Building Construction

open access: yesJurnal Teknik Sipil dan Perencanaan, 2023
Along with Indonesia's economy and population growth, the community's need for building construction and infrastructure will also increase. Project implementation is undoubtedly expected to meet the predetermined quality, time, and cost targets, so a ...
Muhammad Faizal Ardhiansyah Arifin   +2 more
doaj   +1 more source

An integrated framework using Augmented Reality (AR) and Building Information Modeling (BIM) for enhancing the stakeholders' interaction in 4d modeling of linear projects [PDF]

open access: yesمهندسی عمران شریف, 2022
The project schedule is a critical factor in project success in the Architecture, Engineering, and Construction (AEC) industry. An efficient schedule can develop a shared vision (i.e., understanding) among project stakeholders.
Kh, Ghorab, H. Taghaddos
doaj   +1 more source

The Difficulty in Following Project Schedule as a Key Project Management Challenge: Family Firm Perspective [PDF]

open access: yesManagement and Economics Review, 2016
The problem of how to manage projects successfully has been gaining growing interest for the last decades. The aforementioned is mainly caused by the fact that project management offers a wide range of methods and tools which, when properly used, can ...
Joanna SADKOWSKA
doaj  

Stochastic Earned Duration Analysis for Project Schedule Management

open access: yesEngineering, 2022
Earned duration management (EDM) is a methodology for project schedule management (PSM) that can be considered an alternative to earned value management (EVM).
Fernando Acebes   +3 more
doaj   +1 more source

Eliminating Sub-Optimality in Earned Value Management Scheduling

open access: yesIEEE Access
Strategic and operational project successes rely on optimal implementation, with time-to-execution being a key value driver and competitive advantage. Earned Value Management (EVM) is the most pervasive approach to scheduling and cost monitoring in large-
C. Capone, G. Kretzschmar, T. Narbaev
doaj   +1 more source

Using BIM Model and Genetic Algorithms to Optimize The Crew Assignment for Construction Project Planning

open access: yesInternational Journal of Technology, 2014
Project planning is among the most critical factors to the success of a construction project. In project planning, cost and schedule are closely interrelated, because they share a lot of common data in their planning processes. Therefore, the integration
Yi-Jao Chen   +3 more
doaj   +1 more source

Schedule contingency analysis for transit projects using a simulation approach

open access: yesJournal of Civil Engineering and Management, 2013
This paper presents a probabilistic method to establish schedule contingency levels based on percent completion of the project. The objective is providing a distribution for contingency for various percent completion levels which allows the project owner/
Asli Pelin Gurgun, Ye Zhang, Ali Touran
doaj   +1 more source

Overview about project planning

open access: yesStudies and Scientific Researches: Economics Edition, 2012
The purpose of this article is to present the main aspects regarding project planning. This study is generally based on the fourth edition of the Guide to the Project Management Body of Knowledge (PMBOK Guide) developed by the Project Management ...
Catalin Drob
doaj   +1 more source