In Malaysia, the majority of oil & gas platform construction use fixed type substructure such as jacket type platform. To date, only one Semi-FPS has been constructed in Malaysia involving complex and challenging issues in the construction of hull ...
W. A. Z. Wan Abd Rahman +2 more
doaj +1 more source
Integrated multi-resource planning and scheduling in engineering project [PDF]
Planning and scheduling processes in project management are carried out sequentially in prac-tice, i.e. planning project activities first without visibility of resource limitation, and then schedul-ing the project according to these pre-planned ...
Samer Ben Issa, Yiliu Tu
doaj +1 more source
Cost Optimal Project Scheduling
Cost Optimal Project Scheduling This paper presents the cost optimal project scheduling. The optimization was performed by the nonlinear programming approach, NLP. The nonlinear total project cost objective function is subjected to the rigorous system of the activity precedence relationship constraints, the activity duration ...
Klanšek, Uroš, Pšunder, Mirko
openaire +2 more sources
Developing BIM-assisted as-built schedule management system for general contractors
Construction project control attempts to obtain real-time as-built schedule information and to eliminate project delays by effectively enhancing dynamic schedule control and management.
Hui-Ping Tserng +2 more
doaj +1 more source
Practical crash duration estimation for project schedule activities
The increasing demand in project acceleration in the construction industry has led to the development of a practical crash duration estimation model for activities.
Fachrurrazi, Saiful Husin
doaj +1 more source
Eliminating Sub-Optimality in Earned Value Management Scheduling
Strategic and operational project successes rely on optimal implementation, with time-to-execution being a key value driver and competitive advantage. Earned Value Management (EVM) is the most pervasive approach to scheduling and cost monitoring in large-
C. Capone, G. Kretzschmar, T. Narbaev
doaj +1 more source
Purpose: The issue resource over-allocating is a big concern for project engineers in the process of scheduling project activities. Resource over-allocating drawback is frequently seen after scheduling of a project in practice which causes a schedule to ...
Aidin Delgoshaei +2 more
doaj +1 more source
Stochastic Earned Duration Analysis for Project Schedule Management
Earned duration management (EDM) is a methodology for project schedule management (PSM) that can be considered an alternative to earned value management (EVM).
Fernando Acebes +3 more
doaj +1 more source
Applying Bayesian networks to model uncertainty in project scheduling [PDF]
PhDRisk Management has become an important part of Project Management. In spite of numerous advances in the field of Project Risk Management (PRM), handling uncertainty in complex projects still remains a challenge.
Khodakarami, Vahid
core +4 more sources
Dynamic resource constrained multi-project scheduling problem with weighted earliness/tardiness costs [PDF]
In this study, a conceptual framework is given for the dynamic multi-project scheduling problem with weighted earliness/tardiness costs (DRCMPSPWET) and a mathematical programming formulation of the problem is provided.
Ulusoy, Gündüz +5 more
core +2 more sources