Robust Project Scheduling [PDF]
The well-known deterministic resource-constrained project scheduling problem (RCPSP) involves the determination of apredictive schedule (baseline schedule or pre-schedule)of the project activities that satisfies the finish-start precedence relations and ...
Deblaere, Filip +3 more
openaire +3 more sources
Scheduling Optimization of Prefabricated Construction Projects by Genetic Algorithm
Prefabricated buildings are the direction of the future development of the construction industry and have received widespread attention. The effective execution of prefabricated construction project scheduling should consider resource constraints and the
Linlin Xie, Yajiao Chen, Ruidong Chang
doaj +1 more source
Resource-Constrained Multi-Project Reactive Scheduling Problem With New Project Arrival
Reactive project scheduling is an important branch of project scheduling under uncertainty. This paper proposes a resource-constrained multi-project reactive scheduling problem (RCMPRSP) with new project arrival to minimize the adjustment cost of the ...
Wuliang Peng, Dongmin Yu, Jiali Lin
doaj +1 more source
Linear Project-Scheduling Optimization Considering a Reverse Construction Scenario
The linear scheduling method (LSM) for optimization in linear projects has been the focus of numerous academic studies over the years. However, research on incorporating reverse construction activities and other practical scenarios, such as flexible ...
Ze Yu +4 more
doaj +1 more source
Research on Construction Schedule Optimization of Assembly Building Based on NSGA-II [PDF]
Considering multiple possible scenarios in the process of project construction, the prefabricated project scheduling problem is studied in combination with the theory of multi-mode resource-constrained project scheduling problem.
Wang Ru, Lian Jing
doaj +1 more source
A ship that is still carrying out sailing activities must always be in a state that is in accordance with the classification and statutory. Maintenance or repair is needed for the ship in order to stay in good condition and fit to sail.
Laily Okta Oktafiana, Intan Baroroh
doaj +1 more source
Goal: The issue of resource allocation is a major concern for project engineers in the scheduling process of a project. Resources over-allocation are often seen in practice after the scheduling of a project, which makes scheduling unhelpful. Modifying an
Pouya Mehrdad +2 more
doaj +1 more source
Planners face many obstacles during the planning phase of any new project, especially project scheduling due to the numerous details and complexity of each uniquely designed project; previous experience in similar projects and traditional scheduling ...
Sherif El-Habashy +4 more
doaj +1 more source
Portfolio scheduling: an integrative approach of limited resources and project prioritization [PDF]
The main issue for portfolio managers is to find a feasible schedule that guarantees the availability of the resources required by the activities at the dates they are scheduled, which is the classical objective of the Resource-Constrained Multi-Project ...
Félix Villafáñez +4 more
doaj +1 more source
Cost Optimal Project Scheduling
Cost Optimal Project Scheduling This paper presents the cost optimal project scheduling. The optimization was performed by the nonlinear programming approach, NLP. The nonlinear total project cost objective function is subjected to the rigorous system of the activity precedence relationship constraints, the activity duration constraints ...
Klanšek, Uroš, Pšunder, Mirko
openaire +2 more sources