Results 21 to 30 of about 893,353 (312)

Increasing Speed Scheduling and Flow Scheduling [PDF]

open access: yes, 2010
Network flows and scheduling have been studied intensely, but separately. In many applications a joint optimization model for routing and scheduling is desireable. Therefore, we study flows over time with a demand split into jobs. The objective is to minimize the weighted sum of completion times of these jobs.
Sebastian Stiller, Andreas Wiese
openaire   +1 more source

Effect of Schedule Compression on Project Effort in COCOMO II Model for Highly Compressed Schedule Ratings

open access: yes, 2008
This paper presents the effect of ‘schedule compression’ on software project management effort using COCOMO II (Constructive Cost Model II), considering projects which require more than 25 percent of compression in their schedule.
Khoja, Shakeel   +3 more
core   +2 more sources

Monitoring of Weekly Sleep Pattern Variations at Home with a Contactless Biomotion Sensor

open access: yesSensors, 2015
Many people find that their sleep is restricted or disturbed by social obligations, including work. Sleep phase delays can affect an individual’s circadian rhythms on the following day and cause daytime sleepiness and/or poor performance.
Masanori Hashizaki   +2 more
doaj   +1 more source

Protocol Scheduling

open access: yes, 2021
Interactions amongst different processes in concurrent software are governed by a protocol. The blocking I/O operations involved in a protocol may temporarily suspend the execution of some processes in an application. Scheduling consists of the allocation of available processors to the appropriate non-suspended processes in an application, such that ...
K.P.C. Dokter (Kasper)   +1 more
openaire   +3 more sources

How to schedule night shift work in order to reduce health and safety risks

open access: yesScandinavian Journal of Work, Environment & Health, 2020
OBJECTIVES: This discussion paper aims to provide scientifically based recommendations on night shift schedules, including consecutive shifts, shift intervals and duration of shifts, which may reduce health and safety risks.
Anne Helene Garde   +14 more
doaj   +1 more source

Overview about project planning

open access: yesStudies and Scientific Researches: Economics Edition, 2012
The purpose of this article is to present the main aspects regarding project planning. This study is generally based on the fourth edition of the Guide to the Project Management Body of Knowledge (PMBOK Guide) developed by the Project Management ...
Catalin Drob
doaj   +1 more source

Un modelo para estimar la distribución de la carga de trabajo del estudiante del horario conjunto = A model to estimate the distribution of the student's work load from the joint schedule

open access: yesAdvances in Building Education, 2020
Una carga de trabajo desigualmente distribuida a lo largo de un semestre es uno de los factores cruciales que afectan el desempeño académico de los estudiantes universitarios.
Julián F. Conesa Pastor   +3 more
doaj   +1 more source

To schedule or not to schedule: When no-scheduling can beat the best-known flow scheduling algorithm in datacenter networks [PDF]

open access: yesComputer Networks, 2020
Conventional wisdom for minimizing the average flow completion time (AFCT) in the datacenter network (DCN), where flow sizes are highly variable, would suggest scheduling every individual flow. However, we show that considering scheduling delay (including scheduler's computational and communication delays), serving most of the flows without any ...
Soheil Abbasloo   +2 more
openaire   +4 more sources

Fairness in Scheduling

open access: yesJournal of Algorithms, 1998
Summary: On-line machine scheduling has been studied extensively, but the fundamental issue of fairness in scheduling is still mostly open. In this paper, we explore the issue in settings where there are long-lived processes which should be repeatedly scheduled for various tasks throughout the lifetime of a system.
Miklós Ajtai   +5 more
openaire   +4 more sources

Project management as an anti-planning measure for the effective preparation and implementation of the urban development plans in the Global South

open access: yesCogent Engineering, 2023
The preparation of urban development plans and their implementation for urban development in the Global South are often not treated as projects, despite the time, cost and other resource implications. Urban development plan preparation and implementation
Dillip Kumar Das
doaj   +1 more source

Home - About - Disclaimer - Privacy