Results 81 to 90 of about 491,574 (256)

Degradation mechanism of the von Willebrand factor A2 domain by nattokinase

open access: yesFEBS Letters, EarlyView.
Nattokinase, a natto‐derived protease, exhibits potent antithrombotic effects. This study demonstrates that nattokinase directly cleaves the von Willebrand factor (vWF) A2 domain in vitro. Unlike the native regulator ADAMTS13, nattokinase degrades folded vWF independently of shear stress.
Ryuichi Hyakumoto   +3 more
wiley   +1 more source

When greediness fails: Examples from stochastic scheduling [PDF]

open access: yes
The purpose of this paper is to present examples which show that deterministic and stochastic scheduling problems often have a surprisingly different behavior.
Uetz,Marc
core  

Multiobjective scheduling for semiconductor manufacturing plants [PDF]

open access: yes, 2010
Scheduling of semiconductor wafer manufacturing system is identified as a complex problem, involving multiple and conflicting objectives (minimization of facility average utilization, minimization of waiting time and storage, for instance) to ...
Azzaro-Pantel, Catherine   +3 more
core   +1 more source

Improving the job shop scheduling algorithm to minimize total penalty costs considering maintenance activity

open access: yesOPSI
Production scheduling is generally based on the assumption that resources are always available. In reality, these resources, machines, and supporting facilities experience limited availability due to interruptions during the production process. Therefore,
Puryani Puryani   +4 more
doaj   +1 more source

Salmonella lipopolysaccharide‐containing supported lipid bilayers as platforms to study bacteriophage interactions

open access: yesFEBS Letters, EarlyView.
We present robust protocols for the preparation of supported lipid bilayers (SLBs) incorporating either Salmonella smooth LPS or outer membrane vesicles (OMVs). We use a combination of quartz crystal microbalance with dissipation (QCM‐D) and fluorescence microscopy to both characterize the SLBs of various compositions and to probe their interactions ...
Hudson P. Pace   +6 more
wiley   +1 more source

Solution and quality robust project scheduling: a methodological framework. [PDF]

open access: yes
The vast majority of the research efforts in project scheduling over the past several years has concentrated on the development of exact and suboptimal procedures for the generation of a baseline schedule assuming complete information and a deterministic
Herroelen, Willy, Leus, Roel
core  

Constraint Centric Scheduling Guide [PDF]

open access: yes, 2013
The advent of architectures with software-exposed resources (Spatial Architectures) has created a demand for universally applicable scheduling techniques.
Estan, Cristian   +4 more
core  

Job-shop scheduling with an adaptive neural network and local search hybrid approach [PDF]

open access: yes, 2006
This article is posted here with permission from IEEE - Copyright @ 2006 IEEEJob-shop scheduling is one of the most difficult production scheduling problems in industry.
Yang, S   +3 more
core   +1 more source

From mice to humans—divergent strategies for intestinal homeostasis and regeneration

open access: yesFEBS Letters, EarlyView.
Recent advances such as organoid genome editing, xenotransplantation, imaging, and whole‐genome sequencing have enabled direct studies of human intestinal stem cells (ISCs). These studies reveal species‐specific features, including slower ISC proliferation, distinct injury responses, slower somatic mutation accumulation in humans, and an inverse ...
Keiko Ishikawa   +2 more
wiley   +1 more source

Resource-constrained project scheduling. [PDF]

open access: yes
: Resource-constrained project scheduling involves the scheduling of project activities subject to precedence and resource constraints in order to meet the objective(s) in the best possible way. The area covers a wide variety of problem types.
Herroelen, Willy, Demeulemeester, Erik
core  

Home - About - Disclaimer - Privacy