Results 121 to 130 of about 2,533,411 (358)
Generalization of the critical chain method supporting the management of projects with a high degree of uncertainty and imperfect information [PDF]
In the critical chain method the fundamental notion is the project buffer, and its length is based on task estimation risk. This estimation is almost never unequivocal. If it is not correct, the whole method may turn out to be ineffective.
Dorota Kuchta
core
Core Project Team as a Management Entity for Construction Projects
The complexity of constructed facilities and the high degree of specialisation in design and construction generates very fragmented working environment for the construction project.
Marko Keinänen, Kalle Kähkönen
doaj +1 more source
ABSTRACT Purpose To assess the long‐term effects of a community cancer exercise program on quality of life, fatigue, weight, waist circumference, physical activity levels, lower extremity strength, body mass index (BMI), heart rate, and blood pressure, across non‐metastatic and metastatic patients.
Isaac Oppong, Roozbeh Naemi
wiley +1 more source
NetView technical research [PDF]
This is the Final Technical Report for the NetView Technical Research task. This report is prepared in accordance with Contract Data Requirements List (CDRL) item A002.
core +1 more source
Can project management processes be used to structure active learning tasks? [PDF]
Rachel John Robinson
openalex +1 more source
Crime Against History: Slavery, Race, and the 1776 Report
ABSTRACT With the 2025 executive order, “Ending Radical Indoctrination in K‐12 Schooling,” the Trump administration reestablished the 1776 Commission, which produced The 1776 Report. This article argues that this report, which is an unsubtle response to The 1619 Project, reveals how White Christian Nationalists wish to mandate that a hyper‐patriotic ...
William V. Trollinger
wiley +1 more source
SISTEM MANAJEMEN PROYEK BERBASIS ONLINE MENGGUNAKAN ORACLE [PDF]
In project management activities required good coordination and cooperation between divisions of a compact team for executing the project. During this time, the conventional makes project planning, review and evaluate the tasks of the project, its need ...
ASMARA, RENGGA+2 more
core
METHODS OF SELECTING THE EFFECTIVE MODELS OF BUILDINGS REPROFILING PROJECTS
The article highlights the important task of project management in reprofiling of buildings. It is expedient to pay attention to selecting effective engineering solutions to reduce the duration and cost reduction at the project management in the ...
Александр Иванович МЕНЕЙЛЮК+1 more
doaj +1 more source
White Christian Nationalism: Adult Education and Threats to Democracy
ABSTRACT Adult education has a historical and ongoing commitment to fostering democratic relationships, demonstrated by the tendency of adult education to be called upon when social change and realignment are most desirable. This article considers the philosophical and pragmatic possibilities for adult education at this moment, when White Christian ...
Ralf St. Clair, Lyn Tett, Rob Black
wiley +1 more source
Adult Education Confronting White Christian Nationalism: A Thematic Analysis
ABSTRACT As a way to conclude, this article elaborates key themes that emerged from the collected articles in this volume. Each article carries its own important message about the role of adult education in confronting White Christian nationalism, while here, Prins and Carr‐Chellman offer a thematic interpretation of the volume as a whole. These themes
Esther Prins, Davin Carr‐Chellman
wiley +1 more source