Results 181 to 190 of about 6,348 (198)
Some of the next articles are maybe not open access.

ICRF heating for Wendelstein 7-X

Fusion Engineering and Design, 2003
Abstract The stellarator Wendelstein 7-X is being built in Greifswald, Germany, by the Max-Planck-Institut fur Plasmaphysik. Initially, the heating system will consist of 10 MW ECRH and 4 MW ICRF heating (both cw) and 5 MW NBI (for 15 s every 3 min). ECRH is the principal heating method at a magnetic field of B =2.5 T.
Wesner, F.   +4 more
openaire   +2 more sources

Wendelstein 7-X's CoDaStation

Fusion Engineering and Design, 2014
T. Bluhm   +13 more
openaire   +1 more source

Showdown für Wendelstein 7‐X

Physik in unserer Zeit, 2014
openaire   +1 more source

Helium Refrigeration System for Wendelstein 7-X

2005
Kündig, A.   +3 more
openaire   +2 more sources

Home - About - Disclaimer - Privacy