Nuclear Power Learning and Deployment Rates; Disruption and Global Benefits Forgone
This paper presents evidence of the disruption of a transition from fossil fuels to nuclear power, and finds the benefits forgone as a consequence are substantial.
Peter A. Lang
doaj +1 more source
Structural modelling of cost overrun factors in construction industry [PDF]
Construction industry contributes significantly in improving socio-economic growth of a country. However, this industry usually faces chronic problems such as time overrun, cost overrun, poor quality and others.
Memon, Aftab Hameed
core
Single‐molecule DNA flow‐stretch assays for high‐throughput DNA–protein interaction studies
We describe an optimised single‐molecule DNA flow‐stretch assay that visualises DNA–protein interactions in real time. Linear DNA fragments are tethered to a surface and stretched by buffer flow for fluorescence imaging. Using λ and φX174 DNA, this protocol enhances reproducibility and accessibility, providing a versatile approach for studying diverse ...
Ayush Kumar Ganguli +8 more
wiley +1 more source
Automated construction of lightweight, simple, field-erected structures [PDF]
The feasibility of automation of construction processes which could result in mobile construction robots is examined. The construction of a large photovoltaic power plant with a peak power output of 100 MW is demonstrated.
Leonard, R. S.
core +1 more source
Digital twins to accelerate target identification and drug development for immune‐mediated disorders
Digital twins integrate patient‐derived molecular and clinical data into personalised computational models that simulate disease mechanisms. They enable rapid identification and validation of therapeutic targets, prediction of drug responses, and prioritisation of candidate interventions.
Anna Niarakis, Philippe Moingeon
wiley +1 more source
Applicability of Bromilow´s Time-cost Model for Residential Projects in Slovakia
The concept of construction time has been mentioned by most researchers as one of the key factors of a successful project. Time-cost model for rapid estimation of construction time appeared in the world some fifty years ago and the most mentioned is ...
Mačková Daniela, Bašková Renáta
doaj +1 more source
Assessment of construction cost reduction of nearly zero energy dwellings in a life cycle perspective [PDF]
Concerning Nearly Zero Energy Buildings, it is important to guarantee energy efficiency, thermal comfort and indoor environmental quality, while keeping construction and operational costs low.
Mattoni, B., Zinz, i. M.
core +1 more source
A novel signature integrating genome‐wide analysis with clinical factors predicts recurrence in stage II colorectal cancer and enables a new risk stratification to guide postoperative adjuvant chemotherapy. Clinical risk stratification for postoperative recurrence in patients with pathological stage II (pStage II) colorectal cancer (CRC) is essential ...
Mayuko Otomo +7 more
wiley +1 more source
Modeling of Construction Cost of Villas in Oman
In this research, a model for estimating construction cost of villas is presented. The model takes into account four major factors affecting villa's cost, namely: built up area, number of toilets, number of bedrooms and the number of stories.
MA Al-Mohsin, AS Al-Nuaimi
doaj +1 more source
Contractor project estimates vs. consultant project estimates in Ghana [PDF]
Ten projects constructed in Ghana between 2003 and 2010 are examined and analysed to ascertain the reliability of estimated costs provided for the projects. Cost estimates for five of the projects were calculated by consultants and cost estimates for the
Laryea, Samuel
core