Results 61 to 70 of about 12,754,579 (377)

What to Do When Medical Evidence Can Only Be Generated Through Routine Data: An Example From Pediatric Oncology

open access: yesPediatric Blood &Cancer, EarlyView.
ABSTRACT Children undergoing allogeneic stem cell transplantation often receive off‐label rituximab treatment for Epstein–Barr virus reactivation, using adult dosing without pediatric evidence. This project aims to develop a clinical decision support tool (CDSS) that provides evidence‐based dosing scenarios by analyzing real‐world patient data.
Birgit Burkhardt   +2 more
wiley   +1 more source

Modeling Cost-Estimation Factors for Public Building Projects with Hybrid Approach in Addis Ababa

open access: yesAdvances in Civil Engineering
Assessing the most important cost-influencing factors is essential for enhancing the predictive ability of cost estimation for building construction projects.
Behailu Temesgen Habe   +2 more
doaj   +1 more source

Strategic development of the built environment through international construction, quality and productivity management [PDF]

open access: yes, 2012
This thesis presents a coherent, sustained and substantial contribution to the advancement of knowledge or application of knowledge or both in the field of construction management and economics.
Low, Sui Pheng
core  

The MedSupport Multilevel Intervention to Enhance Support for Pediatric Medication Adherence: Development and Feasibility Testing

open access: yesPediatric Blood &Cancer, EarlyView.
ABSTRACT Introduction We developed MedSupport, a multilevel medication adherence intervention designed to address root barriers to medication adherence. This study sought to explore the feasibility and acceptability of the MedSupport intervention strategies to support a future full‐scale randomized controlled trial.
Elizabeth G. Bouchard   +8 more
wiley   +1 more source

Assessment of Factors Causing Construction Delays in Building Construction Projects in Somaliland

open access: yesAdvances in Civil Engineering
Construction delays (CDs) pose persistent challenges in building projects, leading to budget and schedule overruns. This study aimed to investigate the root causes of CD in Somaliland, and ranks the factors based on significance.
Abdisalam Yusuf Duale   +4 more
doaj   +1 more source

Mapping approach for examining waste management within construction sites [PDF]

open access: yes, 2005
In light of increased awareness on environmental impacts from construction wastes, waste management has become an important factor in construction project management.
Sim, Lee Gaik
core  

A Scientometric Review of System Dynamics Applications in Construction Management Research

open access: yes, 2020
Construction management can be regarded as a complex and dynamic system. In recent years, system dynamics (SD) has been widely applied to solve the complex and dynamic problems in the construction management.
Zezhou Wu   +3 more
semanticscholar   +1 more source

CONCEPTUAL FRAMEWORK FOR INTEGRATING BIM AND AUGMENTED REALITY IN CONSTRUCTION MANAGEMENT

open access: yesJournal of Civil Engineering and Management, 2020
The need for systematic data collection and processing to generate real-time building site progress information is critical. Building Information Modelling (BIM) provides the benefit of aggregating information about the building site on a single ...
R. Machado, C. Vilela
semanticscholar   +1 more source

Lifestyle Behaviors and Cardiotoxic Treatment Risks in Adult Childhood Cancer Survivors

open access: yesPediatric Blood &Cancer, EarlyView.
ABSTRACT Background Higher doses of anthracyclines and heart‐relevant radiotherapy increase cardiovascular disease (CVD) risk. This study assessed CVD and CVD risk factors among adult childhood cancer survivors (CCSs) across cardiotoxic treatment risk groups and examined associations between lifestyle behaviors and treatment risks.
Ruijie Li   +6 more
wiley   +1 more source

Home - About - Disclaimer - Privacy